Creator: Oregon State University. Facilities Services.
Title: Facilities Services Records
Dates: 1888-2003 ( inclusive )
1930-1990 ( bulk )
Quantity: 324 cubic feet, including 8650 sheets and 271 photographs (131 boxes, including 13 oversize boxes, and 172 map folders)
Collection Number: RG 193
Summary: The Facilities Services Records document the physical campus of Oregon State University in Corvallis as well as OSU facilities throughout the state of Oregon beginning with construction of the first building on the current campus in 1888. The records consist predominantly of architectural drawings and files for the design, construction, and modification to structures.
Repository: Oregon State University Libraries
University Archives

121 The Valley Library
Oregon State University
Corvallis, OR 97331-4501
Phone: 541-737-2165
Email: archives@oregonstate.edu
Web: http://osulibrary.oregonstate.edu/archives

Languages: Materials in English. 

Historical Note

Facilities Services at Oregon State University is reponsible for planning, construction, operation, and maintenance of campus facilities and providing a safe environment for faculty, staff, students, and visitors.

Until the early 1990s, Facilities Services was known as the Physical Plant. Until the 1940s, it was common for the head of the physical plant to also be a faculty member in the School of Engineering.

Gordon V. Skelton, a Professor of Highway Engineering, was Superintendent of Surveys, Maps, Roads and Walks, and Fire Protection from 1932 until 1940. From the early 1900s until 1932, he functioned in this role as Chair of the Department of Civil Engineering.

Mark Clyde Phillips, an Associate Professor of Mechanical Engineering, served as Superintendent of Heating from 1910 to 1933 and 1940-1947; he was Superintendent of the Physical Plant from 1933 to 1940. Louis N. Traver served as General Superintendent of the Physical Plant from 1940 to 1947, when Richard A. Adams was appointed to the post. Adams held the position until his retirement at the end of 1971. Subsequent Directors were Everett H. Lillig (1971-1981) and Howard A. Wells, Jr. (1981-1988); and Kathleen Mulligan (1988-1999).

Prior to 1932, there were individual superintendents for heating, buildings, campus and greenhouses, light and power, and plumbing and no general superintendent or head of the Physical Plant.

Content Description

The Facilities Services Records provide in-depth documentation of the physical campus of Oregon State University in Corvallis and OSU facilities throughout the state of Oregon. The records include architectural drawings and plans for structures used in teaching, research, and administration; athletic events; and student housing and dining.

Documentation of the design and construction of major buildings, major renovations, and minor remodeling projects are available in several series and include building specifications, contracts, project manuals, and agreements with architects and engineers. Information about major campus systems, such as electrical, plumbing, fire protection, and heating, are also included. For new construction and major renovations, records of proposals for the Percent for Art public art program are available.

The records include documentation of campus planning; capital expenditures and funding; policies and procedures; land acquisition and ownership; space use; and planning, transportation projects, and other development for the City of Corvallis.

In addition to architectural drawings and plans for individual structures and campus-wide systems, the records include book plans; campus, farm, and property maps; and aerial photographs. The records include plans by numerous architects and designers including John V. Bennes; the Olmsted Brothers; Charles H. Burgraff; Lee Thomas; Burns, Bear, McNeil, Schneider, Bloodworth, and Hawes; Hewlett and Jamison; and Jeppsen and Miller.

The bulk of the records pertain to facilities on the OSU campus in Corvallis. However, materials pertaining to facilities at other locations are also available, including Camp Adair and Adair Village; United States Department of Agriculture buildings at the H.J. Andrews Experimental Forest; and research vessels, docks, and buildings at the the Hatfield Marine Science Center in Newport.

The Gordon V. Skelton correspondence in Series X includes materials pertaining to Skelton's role as chair of the Civil Engineering Department, including curriculum, graduate programs, and interactions with the Dean of Engineering and other campus administrators.

Use of the Collection

Restrictions on Access :  

Collection is open for research.

Preferred Citation :  

Facilities Services Records (RG 193), Oregon State University Archives, Corvallis, Oregon.

Administrative Information

Arrangement :

The records consist of 22 series: I. Architectural Drawings and Plans, 1901-1999; II. Building Project Files, 1938-2002; III. Building Specifications and Reports, 1909-2003; IV. Capital Construction Project files, 1962-1997; V. Facilities Planning and Use Committee Records, 1981-1985; VI. General Construction Files, 1989-1997; VII. Minor Building Modifications Files, 1985-1993; VIII. General Subject Numbered Files, 1968-1991; IX. Committee Records, 1966-2003; X. Correspondence, 1888-2003; XI. Land Ownership and Property, 1940-1951; XII. Policies and Procedures, 1986-1994; XIII. Publications, 1989-2001; XIV. Space Use, 1960-1969; XV. Staff Meeting Minutes, 1992-2001; XVI. Time Records, 1913-1939; XVII. Renderings (Drawings) of Campus Buildlings, 1949-1975; XVIII. Book Plans, 1960-1993; XIX. Lighting (Interior) Study, circa early-mid 1980s; XX. Campus, Farm, and Property Maps, 1899-1900; XXI. Aerial Photographs, 1952-1979; and XXII. Photographs, 1963.

Acquisition Information :  

Transferred from Facilities Services (and the Physical Plant) in numerous accessions from the 1970s through 2007.

Future Additions :  

Additions to the collection are expected.

Related Materials :  

The Memorabilia Collection includes brochures and general information about Facilities Services, information about individual structures, and materials pertaining to campus planning. More detailed information about the construction of some major buildings is available in the records of the corresponding office or department; for example, information about construction and remodeling of the Valley Library (and its predecessors, the Kerr Library and Kidder Hall) are available in the Library Records (RG 009).

Capital Construction Funding Records for 1952-1989 as well as other materials pertaining to buildings and facilities are part of the Business Affairs Records (RG 017).

Additional correspondence of Gordon V. Skelton is available in the Civil Engineering Department Records (RG 030).


Detailed Description of the Collection

Series I:  Architectural Drawings and Plans, 1901-1999,   (bulk 1928-1991)
196 cubic feet (7418 sheets)  ( 151 map folders and 5 oversize boxes)

Series I consists of architectural drawings and plans for construction of or major modifications to most structures on the Corvallis campus and for many at other OSU locations throughout the state. They include facilities used for teaching, research, administration, athletic events, and student housing and dining. This series also include plans for buildings constructed by the United States Department of Agriculture (USDA); projects pertaining to campus-wide systems or multiple buildings; structures at Camp Adair and Adair Village; research vessels; and buildings for which plans were prepared but were not constructed. The lists of building plans typically use the current name of OSU buildings.

Container(s)
Description
Individual Structures, 1901-1999
140 cubic feet (5531 sheets) (109 map folders and 5 oversize boxes)
These plans are for construction of or major modifications to more than a hundred individual structures on the Corvallis campus and at other OSU locations in Oregon. They include facilities used for teaching, research, administration, and athletic events. A plan-level list with building name, plan title, date, architect, and number of sheets is available online.
Student Housing, 1928-1996
25 cubic feet (1103 sheets) (18 map folders and 2 oversize boxes)
The Student Housing plans are for student housing and dining structures. They include plans for Arnold Dining Hall and Bloss and Finley Residence Halls; Buxton, Cauthorn, Hawley, and Poling Halls; Azalea House; College Inn; Heckart and Reed Lodges; the Housing Service Building; Married Student Housing; Sackett, Snell, and Weatherford Halls; and the West Hall Dormitory and Cafeteria. Plans for several structures that were not built are also included. A plan-level list with building name, plan title, date, architect, and number of sheets is available online.
USDA Buildings, 1967-1984
2 cubic feet (273 sheets) (1 oversize box and 3 map folders)
The USDA Buildings plans are for structures on the Oregon State University Corvallis campus or other properties that were constructed by the United States Department of Agriculture (USDA) for its research units. They include plans for the Forestry Sciences Laboratory, the National Forage Seed Production Research Center, and the Ornamental Plans Research Facility on the Corvallis campus as well as plans for the administrative site at the H.J. Andrews Experimental Forest near Blue River, Oregon, in the central Cascade Range. A list of the USDA Buildings plans is available online.
Campus Wide, 1948-1993
25 cubic feet (344 sheets) (2 oversize boxes and 13 map folders)
Plans that document projects that pertain to campus-wide systems or multiple buildings are included in this subseries. These include plans for electrical systems, fire alarm systems, handicapped accessibility and safety deficiency corrections, parking lots, roofs, sidewalks and streets, subsurface investiagions, underground fuel tank removal, utility tunnels, and water systems. A list of the Campus Wide plans is available online. Plans pertaining to the utility tunnels are described by plan title; all other plans are described at the folder-level with the range of dates of the contents of each folder.
Camp Adair (Adair Village), 1946-1979
1 cubic foot (75 sheets) (1 oversize box and 4 map folders)
The Camp Adair (Adair Village) plans consist of plans for structures used by Oregon State College from the end of World War II (1946) through the late 1970s as well as maps of the camp and village.
* Adair Air Force Station, 1958-1969
35 sheets
Box
107 Adair Village Boundary Survey, 1949
2 sheets
* Library Storage, 1973-1979
3 sheets
107 Library Storage, undated
4 sheets
* Maps of Lands and Rights of Way, 1946-1949
10 sheets
* Veterans Housing Project for Corvallis, Oregon, 1946
15 sheets
* Veterans Temporary Housing, 1946
6 sheets
Research Vessels, 1959-1963
2 cubic feet (35 sheets) (2 map folders)
These plans are for oceanographic research vessels built or modified by Oregon State University.
Not Built, 1930-1975
1 cubic foot (57 sheets) (2 oversize boxes and 2 map folders)
These plans are for buildings and structures that were not constructed. They include a proposed agricultural engineering bulding (1953), an agricultural sciences and continuing education complex (1969), a biological science building (1930), family living center (1962), Oceanography III building (1975), Navy ROTC building (1945), and a research laboratory building (1945). In some cases, they represent proposed buildings for which approval or funding was not received. Plans for student housing structures that were not built are in the Student Housing subseries. A list of these Not Built plans is available online; the list provides building name, plan title, date, architect, and number of sheets.

^ Return to Top

Series II:  Building Project Files, 1938-2002,   (bulk 1974-1998)
84.3 cubic feet including 138 photographs  ( 87 boxes and 1 map folder)

The building project files document the construction, renovation, and maintenance of various OSU buildings and include building specifications, contracts, correspondence, project manuals, progress reports, contract insurance reports, agreements with architects and engineers, contract proposals, and statements of qualifications. Structural repair and maintenance projects are also described in this series and cover insulation installation, re-roofing, and HVAC system management. Architectural drawings and plans have been separated to Series I. Records documenting the selection and installation of artwork funded by the Percent for Art public art program are also included in this series. The series includes photographs (indicated below). This series includes records pertaining to capital construction projects.

Container(s)
Description
Box
1 Parker Stadium Additions, 1966-1969
1 Mechanical Engineering Building, 1966-1968
1 Earth Sciences Addition, 1964-1977
1 Oceanography Building-First Addition, 1968
1 Kidder Hall, 1964
1 Oceanography Building-First Addition, 1968
1 Kerr Library-First Addition, 1964-1973
2 Kerr Library-First Addition, 1969-1973
2 Horse Center/Arena, 1966-1975
2 Animal Isolation Facility, 1968-1978
2 Dixon Recreation Center, 1971-1976
2 Covell Hall-KOAC, 1976-1978
2 Bicycle Rack Covers, 1976
2 Energy Conservation-Instrumentation and Monitoring at OSU, 1977
2 Oceanography Building-First Addition, 1968
2 Parker Stadium Covering, 1976
2-3 Animal Care Facilities, 1973-1976
3 Dearborn Hall Remodel, 1974-1975
3 McAlexander Fieldhouse-Technical Information, 1969-1970
3 Coliseum Substation and Weatherford Switching Station, 1970-1971
3 Cordley Hall Ventilation Improvements, 1978-1979
3 Electrical Distribution System, 1972-1977
3 Dixon Recreation Center, 1978-1979
3 Spring Sports Complex, 1972-1977
3 Snell Hall, 1976
Map Case
* Memorial Union East Directory, undated,
3 Student Union Facilities, 1976-1978
4 Student Union Facilities (includes Memorial Union remodel), 1976-1981
4 Gilbert Hall Addition, 1978-1981
5 Gilbert Hall Addition and Renovation, 1978-1981
Includes photographs in Budget Summary and Construction Summary folders.
5 Safety Deficiencies Phases I-III (and corrections), 1975-1980
Agriculture Hall, Batcheller Hall, Bexell Hall, Cordley Hall, Covell Hall, Dearborn Hall, Dryden Hall, Farm Crops Building, Forest Research Lab, Gilbert Hall, Gill Coliseum, Kidder Hall, Langton Hall, Oceanography Building, Rogers Hall, Shepard Hall, Vocational Shops, Weniger Hall, Wiegand Hall, Wilkinson Hall, and Women’s Building
Map Case
* Phase I, Fee Analysis (1 sheet), undated
6 Safety Deficiencies Phases I-II, 1978-1979
Nash Hall, and Dryden Hall
6 Physical Plant Warehouse Building #2 , 1979
6 Plageman Infirmary , 1978
6 Forest Research Lab, 1979
6 Re-Roofing Projects, 1979-1980
Agriculture Utilities, Gill Coliseum, Merryfield Annex, McAlexander Field House, Langton Hall, Pharmacy Building, Plageman Infirmary, Covell Hall, Weniger Hall, Withycombe Hall, and Orchard Street Nursery
6 Gill Coliseum , 1980
6 Tennis Court Resurfacing, 1976-1978
6 Tennis Court Resurfacing, 1976-1978
6 Residence Halls Covered Walkway Painting, 1976-1978
Callahan Hall, McNary Hall, West Hall, Buxton Hall, and Poling Hall
6 Sidewalk Repairs and Wheelchair Ramps, 1979-1980
6 Street Lighting Improvements, 1979-1980
6 Street Overlays, 1979-1980
6 Veterinary Barn, 1979
6 Vocational Shops Storage Building, 1980
6 Exterior Painting, 1979
Waldo Hall and Agricultural Utility Building
6 Weniger Hall, 1980
6 West Greenhouse, 1980
6 Kitchen Modifications, 1980
West Hall and Weatherford Hall
6 Weatherford Hall, 1981
6 Re-Roofing Projects, 1978
Withycombe Hall and Merryfield Hall
6 Withycombe Hall, 1975-1979
6 Women’s Softball Field, 1979
6 Veterinary Hospital, 1980-1982
7 Veterinary Medicine Teaching Hospital (Magruder Hall), 1979-1983
Includes photographs in Roof-VMTH folder
8 Veterinary Medicine Teaching Hospital, 1979-1980
8 Crop Science Building, 1980
8 Memorial Union, 1979
8 Education Hall, 1976-1978
8 Roofing Projects, 1978
Withycombe Hall, Social Science Building, Heating Plant, and Merryfield Hall
8 Adair Village Library Storage, 1978-1980
8 Exterior Painting, 1977-1979
Apperson Hall, Batcheller Hall, Covell Hall, Dearborn Hall, Women’s Building, Moreland Hall, and Langton Hall
8 Ionization Detectors, 1979
Avery Lodge and Dixon Lodge
8 Bexell Halll, 1979
8 Cordley Hall, 1979
8 Dawes House, 1977-1978
8 East Greenhouse, 1979
9 Exterior Painting, 1980
Education Hall, Kerr Library Walkway, Nash Hall, Peavy Hall, and Pharmacy Building
9 Gill Coliseum WIA Remodel, 1980
9 Housing Warehouse Lot Expansion, 1979
9 Marine Science Center, 1979
9 Infirmary New Hot Water Piping, 1980
9 Milam Hall Sanitary Sewer Repair, 1979
9 Oceanography Addition, 1979-1980
9 Parker Stadium Structural Steel & Handrails Painting, 1995-1996
9 Maintenance, 1984-1985
Administration Building, Apperson Hall, Bexell Hall, Buxton Hall, Campus, Cauthorn Hall, Ch2M Building, Coed Cottage, Computer Science, Cordley Hall, Covell Hall, Crop Science, Dairy Center, Dearborn Hall, Dryden Hall, East Greenhouse, Education Hall, Elementary Education room 220C, Fairbanks, Freight Office, Gilbert Hall, Gill Coliseum, Gilmore Hall, Heating Plant, Industrial Building, Information Booth, Kidder Hall, Lab Animal Resource Center, Langton Hall, Library, Magruder Hall, McAlexander Fieldhouse, Memorial Union, Merryfield Hall, Milam Hall, Milne Computer Center, Moreland Hall, Nash Hall, Naval Armory, Ocean II, OSU Credit Union, Outdoor Directory Near Bookstore, Park Terrace, PE Laundry, Peavy Hall, Pharmacy Building, Plageman Hall, President’s Residence, Radiation Center, Snell Hall, Steam Tunnel, Stewart Center, Student Health, Tunnel Mall in Jefferson, Vocational Shops, Waldo Hall, Weniger Hall, West Greenhouse, Wilkinson Hall, Wilson Hall, Withycombe Hall, and Women’s Building
9 Weniger Hall, 1984-1985
9 Langton Hall, 1985
9 Marine Science Center, 1976-1977
9 Marine Science Center Library, 1974-1980
9 Marine Science Center East Parking Lot, 1977
9 Cultural and Conference Center, 1979-1982
9 Veterinary Hospital, 1979-1980
10 Gilbert Hall Addition and Renovation, 1979-1983
10 Gill Coliseum, 1984
10 Small Contract Bids, 1972-1973
Administration Services Building, Ag Chem Department, Animal Science Shed, Arnold Way Sidewalk, Dryden Hall, Student Health Services, Weniger Hall, Women’s Building, and Wyckoff Memorial Volleyball Court
10 Campus Outdoor Lighting, 1971-1980
10 National Forage Seed Research Center, 1981-1985
10 Stadium Avenue Revisions Phase I, 1981-1982
10 Parking Improvements, 1980-1981
10 Newport Marine Science Center Paving Project, 1980
10 Oceanography Annex Remodeling, 1981
10 Parker Stadium TV Crew Shelter, 1979-1980
10 Parker Stadium Football Facilities, 1979-1980
10 Martel House, 1977-1980
10 Parker Stadium Improvements, 1967-1969
10 Tennis Courts, 1976
10 Utility Tunnel and Heating Plant Insulation, 1982
10 Veterinary Diagnostic Laboratory, 1981
10 Water Study, 1969-1979
10 Weatherford Hall Modernization, 1981
10 Weniger Hall Air Conditioning, 1981-1982
10 West Greenhouse and Motor Pool Annex Re-Roofing, 1981
10 Withycombe Hall Solar and Atmospheric Radiation Laboratory, 1980-1981
10 Women’s Building Remodel, 1981
10 Withycombe Hall, 1975
10 Spring Sports Complex, 1972-1976
10 Marine Science Center Dormitory Addition, 1974-1975
10 Kidder Hall Study, 1979
10 Administration Building Mechanical System Study, 1981
10 Cordley Hall Refrigeration System Revisions, 1976-1977
10 Primary Power Distribution System Short Circuit Study, 1974
10 Electrical Distribution Facilities Study, 1971
11 Electrical Engineer’s Services: CH2M Hill, 1971-1976
11 Electrical Distribution System: Engineering Payments, Engineering and Design Associates, , 1974-1980
11 Construction Reports, 1981
11 Motor Pool Re-roofing, 1981
contract payment request
11 Motor Pool Annex Re-roof: Jack Largent Company, 1981
11 Gill Coliseum: New Maple Floor-Correspondence, 1972-1973
11 Wiegand Hall: Re-roofing, 1975-1978
11 Agriculture Hall: Re-roofing, 1981
11 Gilbert Hall Addition, 1977-1981
11 Memorial Union Phase III, 1978-1982
11 Fire Alarm Study: Prepared for OSU Physical Plant Dept, 1971
11 Campus Fire Alarm System: OSU, 1974
11 Marine Science Center Aquaculture Lab, 1977-1982
12 Marine Science Center Aquaculture Lab, 1978-1981
12 Marine Science Center Research Support Facility, 1979-1982
12 Administrative Services Building Room B 210-E Contract, 1980
12 Administrative Services A/B HVAC Study-Keith Kruchek, 1981
12 Andrews Experimental Forest, 1980-1981
12 Campus Outdoor Lighting System Improvements, 1975-1976
12 Cauthorn Hall Lounge Remodel Contract, 1979
12 Cordley Hall Ammonia Replacement Program, 1979
12 Cordley Hall Alterations: Siemens Electron Microscope, 1980
12 Cordley Hall Third Floor Cold Storage Renovation, 1981
12 Quad Floor Lounge Partitions Housing: Architect, 1978-1979
12 Data Services Center: Administrative Building Air Conditioning, 1980
12 Data Services Center: Heat Balancing-Keith Kruchek, 1979-1980
12 Dearborn Hall Remodel Rooms 202 Through 206 and 301 Contracts, 1981-1982
12 Dryden Hall Remodel Rooms 204 and 205 Contract, 1979-1980
12 Earth Sciences (Wilkinson Hall) Roof, 1973-1977
13 Education Hall Stair Covering, 1981
13 Parking Lots, 1978
Finley Hall and McAlexander Fieldhouse
13 Precast Concrete Joint Re-caulking, 1975
Finley Hall and Bloss Hall
13 Gill Coliseum Football Locker Room Remodel, 1980
13 Primary Electrical Distribution System, 1969-1975
Oceanography Building, Bioscience Building, Heating Plant, Forestry Building, Administration Building, Bloss Hall, Arnold Hall, Library, Chemistry Building, Agricultural Sciences Building, Married Student Housing, Intramural Recreation, Student Health Services Addition, Weatherford Hall, Art Center, Batcheller Hall, Covell Hall, Physical Plant, and Civil Engineering Building
13 Forest Research Laboratory, 1980-1981
13 Gilbert Hall Piping Modifications, 1980-1981
13 Gill Coliseum Remodel, 1979-1980
13 Handrail Modifications, 1981-1982
Education Hall, Extension Hall, Gilmore Hall, Graf Hall, Merryfield Hall. Pharmacy Hall, and Social Science Building
13 Gill Coliseum Maple Flooring, 1971-1972
13 Heating Plant Boiler Re-Tubing, 1981
13 Heating Plant Replace Breeching, 1981
13 Industrial Building Printing Plant Remodel, 1980
13 Kerr Library Lighting Study, 1981
13 Kidder Hall Heating and Cooling System Analysis, 11979-1980
13 Langton Hall Swimming Pool Drainage Modifications, 1982
13 Marine Science Center Fire Detection System, 1982
13 Marine Science Center Freeze Protection Building, 1980-1981
13 Marine Science Center Paving Project, 1980
13 McAlexander Fieldhouse Remodel, 1980
13 Magnetic Water Conditioners, 1980
McNary Hall, Wilson Hall, and Callahan Hall
13 Martel House Remodel, 1980
13 McNary Hall Cafeteria Chiller Replacement, 1980-1981
13 McNary Dining Hall Heating and Air Conditioning System Study, 1979-1981
13 Median Improvements on 26th Street (between Western Avenue and Washington Way), 1981
13 Milne Computer Center Halon Fire Suppression System, 1981
13 Moreland Hall Handrail Modifications, 1981
13 Motor Pool Re-Roofing, 1981
13 Construction Progress Report, 1982-1983
Memorial Union Remodel, Handicapped Accessibility, Washington Way Tennis Court Renovation, Gilbert Hall Renovation, Crop Science Building, Newport Research Support Facility, and Veterinary Medical Teaching Hospital
13 Re-Roofing Projects, 1982
Heating Plant, Agriculture Hall, Extension Hall, and Women’s Study Center
13 Madison Avenue Landscaping (between 9th and 11th Streets), 1983
13 Marine Science Center Covered Walkway, 11980-1984
13 Weniger Hall HVAC Systems, 1975-1980
13 Wilkinson Hall Addition, 1979
13 Wall Partitions, 1979
Cauthorn Hall and Hawley Hall
13 Parking Lot (26th and Parker Stadium), 1985
13 Spring Sports Complex, 1980-1981
13 Waldo Hall Remodel, 1979
13 Extension Annex Addition and Alterations, 1982
13 Extension Hall Parking Lot Overlay, 1982
13 Extension Hall Parking Lot Overlay, 1982
13 Farm Crops Building Access Flooring, 1982
13 Heating Plant Oxygen Analyzers, 1983
13 Arnold Dining Hall Folding Partition, 1982
13 26th Street Island Improvement, 1982-1983
14 Dorm Services Building Addition, 1982
14 Gilbert Hall Addition and Renovation, 1979-1982
14 Heating Plant Oxygen Analyzers, 1983
14 Marine Science Center Backflow Prevention, 1982
14 Newport Research Support Facility, 1981-1982
14 Memorial Union Re-Roofing, 1982
14 Oceanography Biological Curation Building, 1982
14 Steam Condensate Return Pipe Insulation, 1982-1983
14 Weatherford Hall Bathroom Modernization, 1982
14 Gilbert Hall Replacement Windows, 1983
14 Gilbert Renovation, 1980-1982
14 Gilbert Hall Addition and Renovation, 1977-1982
14 Gilbert Hall Remodel, 1980-1983
14 Washington Way Tennis Court Renovation, 1976-1984
14 Memorial Union Remodel Phase IV, 1981-1984
15 Memorial Union Remodel Phase IV, 1982-1983
15 Specifications - Removal of Architectural Barriers to the Handicapped in various buildings at OSU, 1981
15 OSU Foundation Cultural and Conference Center (Changes in the Contract Documents), 1980
15 Intramural/Recreation Building (Dixon Recreation Center Maintenance), 1973-75
15 Gilbert Hall Remodel, 1979-1983
15 Arnold Dining Hall Folding Partition, 1982
15 Oceanography Biological Curation Building, 1982
15 Bio-Mass Gasification Project, 1979-80
15 Construction Insurance, 1976-78
15 Cordley Hall Piping Modifications, 1983
15 Dorm Services Building Addition, 1982-1983
15 Extension Annex Addition and Alterations, 1982-1983
15 Dryden Hall Fire Restoration, 1983
15 Farm Crops Building Access Flooring, 1982
16 Precast Joint Caulking, 1983
Finley Hall and Bloss Hall
16 Proposed “Great Hall”, 1976
16 Insulation of Attics, 1983
Benton Hall, Bexell Hall, Covell Hall, Moreland Hall, Study Center, Waldo Hall, Sheppard Hall, Physical Plant, Milam Hall, Apperson Hall, and Extension Hall
16 Magruder Hall Computer Room Installation, 1983
16 Marine Science Center Backflow Prevention, 1982
16 Marine Science Center Weather Station, 1983
16 Mechanical Room Steam Pipe Insulation, 1983
Agriculture Utilities Building, Apperson Hall, Batcheller Hall, Bexell Hall, Chemical Engineering Building, Cordley Hall, Cordley Addition, Covell Hall, Dearborn Hall, Dryden Hall, Extension Hall, Farm Crops Building, Farm Crops Manhole, Gilbert Hall, Gilmore Hall, Graf Hall, Industrial Building Manhole, Vocational Shops, Kerr Hall, Kidder Hall, Laboratory Animal Resources Building, Langton Hall, Magruder Hall, Milam Hall, Milne Computer Center, Moreland Hall, Nash Hall, Seed Laboratory, Shepard Hall, Plageman Infirmary, Waldo Hall, Wiegand Hall, Wythecombe Hall Boiler Room, Women’s Building, and Women’s Study Center
16 Major Construction Miscellaneous Correspondence, 1971-1973
16 Minor Construction Miscellaneous Correspondence, 1971-1980
16 Performing Arts Center, 1976
16 Re-Roofing Projects, 1983
Oceanography Building, Clark Meat Lab, McAlexander Fieldhouse, Langton Hall, Pharmacy Building, Erma Plageman Infirmary, Covell Hall, Weniger Hall, and Orchard Street Nursery
16 Marine Science Center Parking Lot, 1983
16 Extension Hall Parking Lot Overlay, 1982
16 Weniger Hall Exterior Door Modification, 1983
16 Steam Condensate Return Pipe Insulation (Utility Tunnel), 1983
16 McNary Hall Exterior Finish Replacement, 1983
16 Heating Plant Emergency Generator Modifications, 1983
16 Crop Science Building Fire Protection, 1980-1985
16 Crop Science Building, 1978-1983
17 Crop Science Building, 1978-1984
17 Crop Science Building Fire and Life Safety Review, 1969-1980
17 Oceanography Curation Building Preparation Room, 1983-1984
17 Wave Tank Facility Covering Building, 1982-1983
17 Re-Roofing Projects, 1983-1984
Oceanography Building and Clark Meat Lab
17 Administrative Services Building Data Services Air Conditioning Revision, 1983
17 Mechanical Room Steam Pipe Insulation, 1982
Agriculture Utilities Building, Apperson Hall, Batcheller Hall, Bexell Hall, Chemical Engineering Building, Cordley Hall, Covell Hall, Cordley Addition, Dearborn Hall, Dryden Hall, Extension Hall, Farm Crops Building, Farm Crops Manhole, Gilbert Hall, Gilmore Hall, Graf Hall, Industrial Building North Manhole, Vocational Shops North and South Manhole, Kerr Library, Kidder Hall, Lab Animal Resources Building, Langton Hall, Magruder Hall, Milam Hall, Milne Computer Center, Moreland Hall, Nash Hall, Seed Lab, Shepard Hall, Plageman Infirmary North and South Manhole, Waldo Hall, Wiegand Hall, Withycombe Hall Boiler Room, Women’s Building, and Women’s Study Center
17 Cordley Hall Piping Modifications, 1983
17 Dearborn Hall Access Flooring, 1983
17 East Greenhouse Heating Modifications, 1983
17 Precast Slab Joint Caulking, 1983
Finley Hall and Bloss Hall
17 Insulating Attics, 1983
Apperson Hall, Batcheller Hall, Benton Hall, Bexell Hall, Covell Hall, Dryden Hall, Extension Hall, Fairbanks Hall, Langton Hall, McAlexander Fieldhouse, Milam Hall, Moreland Hall, Physical Plant Office, Shepard Hall, Waldo Hall, Wiegand Hall, and Women’s Study Center
18 Attic Insulation, 1981-1983
University Steam Plant Complex, McAlexander Fieldhouse, Batcheller Hall, Milam Hall, Langton Hall, Wiegand Hall, Covell Hall, Apperson Hall, Extension Hall, Waldo Hall, Moreland Hall, Bexell Hall, Fairbanks Hall, Shepard Hall, Benton Hall, Dryden Hall, Women’s Study Center, and Physical Plant Office
18 Diving Board Handrails, 1982-1984
Langton Hall and Women’s Building
18 Magruder Hall Computer Installation, 1983
18 Marine Science Center Parking Lot, 1983
18 Marine Science Center Weather Station, 1983
18 Marine Science Center Dock Renovations, 1983-1984
18 McNary Hall Exterior Finish Replacement, 1983-1984
18 Milne Computer Center Air Conditioning Modifications, 1983-1984
18 Milne Computer Center Room 210 Remodel, 1983-1984
18 Oceanography Biological Curation Building Preparation Room, 1983-1984
18 Orchard Avenue Parking Lot, 1983
18 Weatherford Hall Hot Water Tank Replacement, 1983
18 Weniger Hall Water Purification System, 1983-1984
18 Test-holes and Proposed Water-well, 1974
18 Dearborn Hall Room 312 Remodel Phases I-II, 1984-1986
18 Gill Coliseum Project I, 1984-1987
19 Gill Coliseum Projects I-IV, 1984-1985
19 Gill Coliseum Portable Stage, 1985
19 Attic Insulation, 1984
Kidder Hall, Gilmore Hall, and Women’s Building
19 Madison Avenue Reconstruction (S.W. Sixth Street to S.W. Eleventh Street), 1981
19 Marine Science Center Covered Walkway, 1984
19 Steam and Condensate Pipe Insulation, 1984
Boiler Plant, Gilbert Hall, Gill Coliseum, Plumbing Shop, Carpenter Shop, Carpenters
19 Carpenters, 1984-1987
Lunch Room, and Strand Agriculture Hall
19 McNary Hall Exterior Finish Replacement Phase II, 1984
19 Re-Roofing, 1984-1985
McAlexander Fieldhouse, Nash Hall, Memorial Union Building, Women’s Building, and Navy ROTC Building
19 Nash Hall Fire Restoration, 1983-84
19 Pharmacy Building Heat Recovery System, 1984
19 East Greenhouse Water Line Replacement, 1984
19 Parker Stadium Artificial Turf Replacement, 1984
19 Women’s Building and Langton Hall Remodel, 1984-85
19 Snell Hall Renovation, 1983
19 Weniger Hall Remodel, 1984-85
19 West Range Greenhouse Plumbing and Electrical Modifications, 1984
19 Weniger Hall Remodel, 1984-85
19 Veterinary Research Laboratory Remodel, 1984
20 Snell Hall Remodel, 1984-85
20 Weniger Hall Remodel, 1984
20 Gill Coliseum Refinish Maple Floor, 1985
20 Waldo Hall Remodel, 1985
20 Dixon Recreation Center Re-roof, 1985
20 Re-roofing, 1984
College Inn, Food Service Warehouse, and Sackett Hall
20 Gill Coliseum Refinish Maple Floor, 1985
20 Utility Data for Langton Hall and Women’s Building, 1984
20 Oceanography II Remodel, 1985
20 Sanitary Sewer Project, 1983
20 Waterline Replacement, 1984-85
Milam Hall, Nash Hall, and Withycombe Hall
20 Women’s Building Remodel, 1984-85
20 Veterinary Medicine Animal Isolation Laboratory Septic Tank Drain Field, 1984
20 Kidder Hall Re-roofing, 1985-86
20 Lab Animal Resources Exterior Wall Insulation, 1983-86
20 Off Duty Service Requests, 1984-87
21 Police and Security Department/Traffic Office Report of Activities, 1983-1986
21 Energy Conservation Measures, 1984-1986
Langton Hall and Women’s Building
21 Re-Roofing, 1984-1987
Nash Hall and Navy ROTC Building
21 Oceanography Building Remodel I-II, 1984-1986
21 Snell Hall Third Floor Remodel, 1985-1986
21 Parking Lot Improvements and Repair, 1985-1986
21 Rogers Hall Insulate Heating and Chilled Water Piping, 1986
21 Weniger Hall Re-Roofing, 1987
21 Weniger Hall Acid Resistant Drain Piping, 1984-1986
21 OSU Horse Center Farrier School Manchester Arena, 1984-1986
22 Kidder Hall Re-roofing, 11985-1987
22 Langton Hall Roofing, 1986-1987
22 Gilbert Hall Renovation, 1980-1986
22 Crew Building, 1986
22 Benton Hall Re-roofing and Exterior Repairs, 1986
22 Batcheller Hall Electrical and Computer Alterations, 1986
22 Heating Plant Economizer Installation, 1986-1987
22 Snell Hall Third Floor Remodel, 1985-1986
22 Women’s Building Re-roof, 1986
22 Snell Hall Re-roof, 1986-1987
22 National Forage Seed Production Research Center, 1983-1986
22 Water Line Replacement, 1984
Milam Hall, Withycombe Hall, Nash Hall, and Rogers Hall
22 OSU Golf Course, 1978-1980
23 Poling and Hawley Halls Lounge Remodel, 1985-1986
23 625 SW 16th Project, 1986-1987
23 West Greenhouse Parking Lot Improvements, 1987
23 Parking Lot Repairs, 1986-1987
23 Snell Hall Re-roofing Project, 1986
23 Soderstrom Architects and Roofing Consultants Correspondence, 1983-1986
Involves majority of campus buildings
23 Floor Refinishing, 1986-1988
Langton Hall and Women’s Building
23 Re-roofing Project, 1987
Callahan Hall, McNary Cafeteria, and West International House
23 Electrical and Computer Engineering Building Alterations for Handicapped, 1986
23 Physical Plant Department Handicapped Access, 1986-1987
23 Graf Hall Alterations, 1986
23 ECE Building and Graf Hall Related Alternations, 1986
23 Apperson Hall and Merryfield Hall Alterations, 1986
23 ECE Building, Apperson, and Merryfield Hall Alterations, 1986-1987
24 Kidder Hall Re-roofing, 1986-1987
24 Memorial Union Storm Sewer, 1987
24 Oceanography Building (Room 424) Remodel, 1986-1988
24 Parking Lot Improvements, 1987-1988
24 Pole Building West of Magruder Hall, 1986-1987
24 Women’s Building Re-roofing, 1986-1987
24 Weniger Hall Re-roofing, 1987-1988
24 Electrical and Mechanical Consulting Services, 1982-1987
24 Asbestos Removal, 1986-1987
Callahan Hall, McNary Cafeteria, and West International House
24 Weatherford Hall Renovation, 1987
24 Restoration, Re-roofing, and Repairs, 1986-1988
Batcheller Hall and Benton Hall
24 Roof Repairs, 1987
Peavy Hall and Langton Hall
24 Clark Meat Lab Sanitary Sewer, 1986-1988
24 Cordley Hall Re-roofing, 1987
25 Dixon Recreation Center Re-roofing, 1988-1989
25 Dixon Recreation Center Weight Room Floor Addition, 1987-1988
25 Physical Plant Communications Conduit Installation, 1988
25 Computer Science Building Alterations, 1986-1987
25 Physical Plant Shops Alterations, 1986-1987
25 Computer Science Building Artwork Installation, 1987-1988
25 Hatfield Marine Science Center Seawater System Investigation and Repair, 1982-1988
25 Hatfield Marine Science Center Proposed Laboratory and Library Addition, 1986-1988
25 Hinsdale Wave Research Lab, 1986-1988
25 Horse Barn and Manchester Arena Re-roofing, 1987-1988
25 Langton Hall Re-roofing, 1987-1988
26 Langton Hall Pool Roof Restoration, 1987-1988
includes photographs
26 McNary Hall Dining Modifications, 1988
26 Memorial Union Ventilation System Improvements, 1987-1988
26 Milam Hall Re-roofing, 1987-1988
26 Irrigation System for 26th and Orchard Street Parking Lot, 1986-1987
26 Peavy Hall (Room 254) Modifications, 1987-1988
26 Target Range Re-roofing, 1987
26 Radiation Center and Campus Lights Energy Conservation Project, 1988
26 Sanitary Sewer Replacement, 1988
Shepard Hall to Education Hall
26 625 S.W. 16th Street Revised Project, 1987-1988
26 Sackett Hall Re-roofing, 1987-1988
27 Plageman Infirmary Re-roofing, 1987
27 Peavy Room 254 Modifications, 1987
27 Women’s Building Remodeling, 1987-1988
27 Shepard Hall to Benton Hall Sewer Line replacement (Devco Engineering), 1985-1988
27 Butke-Transportation, Parking Study Payments, 1982-1988
27 CH2M - Miscellaneous Correspondence, 1986-1987
27 Sewer Line Replacement(Paul and Green Associates), 1986
27 Jeppsen, Miller, & Tobias (Architects), 1979-1988
27 Kidder Hall Remodeling, 1987
27 Cordley Hall Re-roofing, 1987
27 Target Range Re-roofing, 1987
27 Langton Hall Re-roofing, 1987
27 Memorial Union Building Ventilation System Alterations, 1987
27 The Residence Hall Quad Re-roofing Project, 1988
27 HMSC Seawater System Repair, 1987
27 Irrigation Systems Installation - Phase III, 1985-1986
27 Langton Hall and Women’s Building Refinish Floors, 1987
27 Dixon Recreation Center Re-roofing Project, 1987-1988
27 Public and Central Facilities Wing Re-roofing, 1988
28 Warehouse No. 55 Re-roofing, 1988
28 Langton Hall Roof Reconstruction, 1986-1987
28 Snell Forum Re-roofing, 1988
28 Women’s Building Shower Rooms Renovation, 1987
28 The Horse Barn & Manchester Arena Re-roofing Project, 1986
28 Gilmore Hall Re-roofing, 1985
28 Batcheller Hall Cornice Restoration, 1986
28 Women’s Building Re-roofing, 1984
28 Gill Coliseum Exterior Restoration, 1988
28 Withycombe Hall Notice of Plans Review, 1984
28 Milam Hall Notice of Plans Review, 1984
28 Rogers Hall Notice of Plans Review, 1984
28 Nash Hall Notice of Plans Review, 1984
28 Parking Lot Improvements, 1987
28 Milam Hall Re-roofing, 1987
28 Parking Lot Landscaping, 1986
28 Pole Building West of Magruder Hall, 1987
28 Sackett Hall Re-roofing, 1987
28 625 SW 16th Street Revised Project, 1987
28 Target Range Re-roofing, 1987
28 Kidder Hall Re-roofing, 1985
28 Soderstrom Architects Payments and Supplements (Various Projects), 1983-1990
28 Soderstrom Architects Parking Garage Correspondence, 1988
28 Stastny Architects Handicapped Accessibility Phase III Correspondence, 1987-1990
28 Stastny Architects Handicapped Accessibility Phase III Contract, 1978-1990
28 Waldo Hall Elevator Handicapped Accessibility Contract and Correspondence, 1990-1991
29 Stastny Architects Handicapped Accessibility Phase III, 1987-1990
29 Aero Engineering Lab Re-roofing, 1989-1990
29 Ocean Shop Roof Extension, 1990-1991
29 Re-roofing, 1989-1990
Finley Hall and Bloss Hall
29 Burt Hall Re-roofing, 1990-1991
29 Gilbert Hall Basement Heating and Condensate System Modifications, 1988-1991
29 Gill Coliseum Main Roof Re-roofing, 1990-1991
29 Handicapped Accessibility Phase III (Toilet Room Accessibility Projects), 1989-1991
29 Marine Science Center Public and Central Facilities Wing Re-roofing, 1988
29 General Consultants Correspondence (Various Projects), 1985-1988
29 Hatfield Marine Science Center OSU Research Vessel Dock Repair, 1989
29 Memorial Union Craft Center Kiln, 1989-1990
29 Heating Plant Cogeneration, 1986-1989
29 Cordley Hall Chillers (Replacement Study), , 1987-1988
29 Carson, Bekooy, Gulick & Associates, Inc. Correspondence (Various Projects), 1986- 1988
29 Administrative Services Building Expansion, 1986-1989
29 OSU Fish Disease Research Lab Proposal, 1987
29 Gilbert Hall Remodel, 11988-1989
30 Bookstore Remodel, 1989
30 Devco Engineering Correspondence (Various Projects), 1987-1988
30 O.H. Hinsdale Wave Research Laboratory and Addition, 1986-1990
30 Electrical and Computer Engineering Building, 1985-1989
30 Parker Stadium End Zone Improvements, 1989
30 Re-roofing Projects, 1983-1989
Graf Hall, Memorial Union Building, McAlexander Fieldhouse, and President Byrne’s Residence
30 Soderstrom Correspondence (Various Projects), 1986-1990
30 Soderstrom Payments and Supplements (Various Projects), 1983-1989
31 Electrical and Computer Engineering Building (Covell Hall), 1985-1989
31 Electrical and Computer Engineering Building Structural Steel Reports, 1987
31 Electrical and Computer Engineering Building Westcold Duroscrew Machine Repair, 1988-1989
31 Covell Hall Alterations Project II, 1986-1988
31 Administration Building Expansion, 1988-1990
31 Administration Building Halon Fire Suppression System, 1989
32 Administration Building Telecommunications Equipment Housing, 1988-1989
32 Apperson Hall Re-roofing, 1988
32 Benton Hall Acoustical Remodel, 1988-1989
32 Covell Hall Fire Escape, 1988-1989
32 Dixon Recreation Center Re-roofing, 1989
32 Wiegand Hall Fume Hood Installation, 1988-1989
32 East Greenhouse Revisions, 1989
32 Fish Disease Research Laboratory (Phases I-II), 1988-1989
33 Forest Research Laboratory Structural Rehabilitation Phase II, 1988-1989
33 Hatfield Marine Science Center Roofs, 1987-1989
33 Gill Coliseum Exterior Renovation, 1988-1989
33 Graf Hall Alterations, 1988-1989
33 Handicapped Accessibility Phase III, 1987-1990
33 Heating Plant Cogeneration, 1988-1989
33 Memorial Union Bookstore Remodel, 1989
34 Parking Lots and Streets Maintenance and Repair, 1989
34 President’s Residence Re-roofing, 1989
34 Residence Hall Quad Re-roofing, 1988
34 Shepard Hall Re-roofing, 1989
34 Snell Forum Re-roofing, 1988-1989
34 Underground Fuel Tanks Removal, 1988-1989
34 Warehouse No. 55 Re-roofing, 1988-1989
34 Campus Way 11th to 14th Streets Widening Project, 1989-1990
34 Computer Science Building Upper Roof Re-roofing, 1989
34 Food Services Warehouse Freezer, 1988-1990
34 Forest Research Laboratory Electrical Service Improvements, 1987-1990
34 Gill Coliseum Flat Roofs Re-roofing, 1989
35 Gilbert Hall Remodel, 1989
35 Handicapped Accessibility Phase III Contracts A-C, 1988
35 Hinsdale Wave Research Lab, North/South Extension, 1988-1990
35 Marine Science Center Oceanography and Fisheries Wings Re-roofing, 1989-1990
35 Langton Hall Golf Shed Re-roofing, 1989
35 Seed Laboratory, 1989-1990
35 Wiegand Hall Growth Chamber Installation, 1988-1990
35 Wiegand Hall Re-roofing Contract, 1989
36 Wiegand Hall Re-roofing, 1989-1990
36 Withycombe Hall Room 303 Fume Hood, 1988-1990
36 Parker Stadium Improvements Phases I-III, 1987-1990
36 Parker Stadium End Zone Building, 1989-1990
36 Heating Plant, 1938-1942
36 Campus Maintenance-General, 1939-1948
Plageman, Home Economics, Kidder Library; includes photographs
36 Kerr Library Expansion Project, 1994-1996
2 folders
37 644 SW 17th Street Structure Removal, 1992
7200
37 708 SW 16th Structure Removal, 1992
7200
Arnold Hall Cafeteria Reroof, 1990-1992
Box
37 General, 1990-1992
7200
37 Signed Contract, 1991
37 Project Manual, 1991
37 Callahan Hall Water Piping Replacement (signed contract), 1991-1992
17030
37 Campus Fire Alarm Central Reporting System (signed contract), 1990-1992
17030
37 Child Care Center Art Work, 1991-1992
17030
Dixon Aquatics Center, 1992
Box
37 DDC System (project manual), 1991
17030
37 DDC Contract Correspondence, 1991-1992
7200
37 Dryden Hall Reroofing (signed contract), 1991-1992
7200
37 Kidder/Milne Waterline Replacement (signed contract), 1991-1992
17030
37 Peavy Arboretum Machine Shed Expansion (signed contract), 1991-1992
17030, 7200
37 Peavy Arboretum Forest Club Cabin Addition (signed contract), 1990-1992
17030
37 Above Ground Fuel Oil Storage Tanks Phase II, 1992
Foundation-Bids, 1993
7200
Foundation (signed contract), 1993
7200
37 Fuel Storage Tanks Phase II, 1993-1995
7200
38 Fuel Storage Tanks Phase I, 1992-1995
7201
38 Gilmore Hall Parking Improvements, 1993-1995
7201
38 Gilmore Lot, 1994-1995
7201
38 HMSC Pedestrian Walkway, 1993-1994
7201
38 Intramural Field Irrigation, 1993-1995
7201
38 McNary Hall Parking Improvements, 1994
7201
38 Milam/Strand Sanitary/Storm Sewer Replacement, 1993-1994
7201
38 MU Piping Replacement Phase II, 1992
7201
38 Orchard Street Structure Removal “A”, 1992-1994
7201
38 Parker Stadium Grandstand Seating Assembly, 1994
7201
38 Parker Stadium Bleacher Replacement, 1994-1995
7201
39 McAlexander Fieldhouse Area B Reroof, 1992-1993
7200
39 Milam Auditorium Seating Replacement, 1992-1993
7200
Mitchell Gym, 1992-1993
Box
39 General Project Correspondence (Pre-Advertisement), 1992
5000
39 Budget, 1992
5000
39 Cost Estimates (Designer Planner), 1992
5000
39 Public Agency (City, County, EPA, Permit/Code Appeals, Regulatory), 1992-1993
5000
39 A/E Selection, 1991
5000
39 Percent For Art Correspondence, 1992-1993
5000
39 OSBHE Correspondence, 1992
5000
39 Schedules (Project Time), 1991-1992
5000
39 Program(Architect Responsibility), 1991
5000
39 Schematic Design, 1992
5000
39 Design Development, 1992
5000
39 Design Review (In-House), , 1992
5000
39 Contract Documents, 1992
5000
39 Energy Analysis, 1992
5000
39 Bid Preparation, 1992
5000
39 Addenda, 1992
5000
39 Correspondence, Contractor Const. Schedule, Sub List, Surety Letters, 1992-1993
5000
39 Construction Meeting Notes, 1992
5000
39 Special Testing (Concrete, etc), 1992
5000
39 Project Close-out (Punch List, Acceptance recom., Board accept.), 1992-1994
5000
39 DDC System (project manual), 1991
17030
39 A/E Agreement/Supplements, 1992
5000
39 A/E Payments, 1993
5000
39 A/E Contract Correspondence, 1992-1993
5000
39 Contract Change Orders, 1992-1993
5000
39 Contractor Payments, 1992-1993
5000
39 Mitchell Hall Renovation, 1992
5000
39 Rosenfeldt Reroof (Horse Barns), 1992
7200
39 Rosenfeldt Lab and Feed Barn Bldg. Reroofing- signed contract, 1991
17030
39 Sackett Condensate Repair, 1992
7200
39 Sackett Hall Condensate Return Line Repair Rebid- signed contract, 1992
17030
40 Memorial Union Piping Replacement-signed contract, 1992
7200
40 Memorial Union Waterline Replacement, 1992-1993
7200
40 Orchard Street Structure Removal “B”- signed contract, 1992
7200
40 PTW Parking Improvements-signed contract , 1992
7200
40 Sanitary/Storm Sewer Rehabilitation-signed contract, 1992
40 Sewer Rehabilitation, 1992-1994
7200
40 Strand Ag Hall Rooms 136/138 A/C Modifications-signed contract, 1992-1993
7200
40 Street and Parking Lot Patching-signed contracts, 1992-1993
7200, 7201
Wilkinson Hall Reroof, 1989-1993
Box
40 Signed Contract, 1989
40 Project Manual, 1989
40 General, 1989-1993
7200
40 Women’s Bldg 22/24 Remodel (Blood Lab), 1993-1994
7200
40 University Theatre HVAC Rebid, 1992-1993
7200
40 Streets and Parking Lots, 1992
7200
Water Research Lab Reroof, 1991-1993
Box
40 Signed Contract, 1991
40 Project Manual, 1991
40 General, 1989-1993
7200
41 Weniger Hall Reroof, 1992
Signed Contract, 1991
17030
Project-Manual, 1991
17030
General, 1991-1992
Women’s Building Pool Reroofing, 1991-1992
Box
41 Signed contract, 1992
7200
41 General, 1991-1992
7200
41 Women’s Building Window Replacement-signed contract, 1991-1992
7200
Ag Science II, 1990-1992
Box
41 Payments, 1990-1992
7200
41 Planning Minutes, 1988
7200
41 Planning Correspondence Jan-June, 1987-1989
7200
41 Meeting Notes (Weekly Status), 1990-1992
7200
42 Clark Lab and Peavy Repairs, 1992
7200
42 Forest Research Scanning Lab, 1992-1993
7200
42 Industrial Building Demolition, 1992-1993
7200
42 Industrial Building Reroofing-signed contract, 1992-1993
7200
42 Kerr Library Room 134 HVAC-signed contract, 1992
7200
42 Lower Campus Irrigation-signed contract, 1992-1993
7200
University Theatre, 1990-1993
Box
42 Change Orders, 1991
7200
42 Contract Correspondence, 1991-1993
7200
42 Payments, 1991-1992
17030
41 Signed Contract, 1991
41 General, 1990
42 Women’s Building Remodel for Conference Room-signed contract, 1990-1991
17030
42 Parker Stadium Signage, 1991
17030
42 Tennis Court Renovations, 1992-1992
Box
42 Signed Contract, 1991-1992
17030
42 General, 1991-1992
17030, 7200
43 OSU Street and Parking Lot Asphalt Concrete Patching and Paving-signed contract, 1991
43 Parking Lots and Streets, 1991-1992
17030
43 Ocean Administration Building Reroofing-signed contract, 1990
17030
43 Campus Lighting, 1990-1992
17030
43 Hartman Company Supplemental Payments, 1990-1993
8000
43 Hyde & Associates, 1990-1995
8000
43 Hyde & Assoc. Heat Plant Fuel Tanks, 1993-1994
8000
43 Interface Engineering Supplement/Payment, 1992-1994
8000
43 ISES/Facilities Condition Audit, 1991
8000
McBride Ralston, 1991-1993
Box
43 Correspondence, 1991-1992
8000
43 New Agreement Payments, 1990-1993
8000
43 New Agreement Supplemental Payments, 1992-1993
8000
43 1993 Agree. Suppl/Pay, 1993
8000
43 Settecase Smith Doss/Admin Services Lobby, 1993
8000
43 Administrative Services Bldg Remodel, 1992-1993
8001
OSU Environmental Computing Center, 1992-1994
Box
44 A/E Payments, 1992
5000
44 Contract Change Orders, 1992-1994
5000
44 Contractor Payments, 1992-1994
5000
44 Project Manual Specifications, 1992
5000
44 Langton Hall Room 200-Signed Contract, 1989-1990
17030
44 Langton Hall Reroof Areas C, D, & E Signed Contract, 1990-1991
17030
44 Magruder Reroof, 1990-1991
17030
44 Moreland Hall Reroof, 1989-1990
17030
44 Street and Parking Lot Patching, 1990-1991
17030
44 Weniger Hall Room 151 Lighting Improvements, 1990
17030
44 West Hall Cafeteria Reroofing, 1990-1991
17030
44 Wiegand Hall Reroofing Areas B and C, 1990-1991
17030
45 Withycombe-Wiegand Sanitary Sewer Rehabilitation, 1990
17030
OSU Environmental Computing Center, 1991-1993
Box
45 Budget, 1991-1993
5000
45 General Project Correspondence (Pre-Advertisement), 1991-1992
5000
45 Cost Estimates (Designer, Planner), 1991-1992
5000
45 Public Agency (City, County, EPA, Permit/Code Appeals, Regulatory), 1991-1993
5000
45 Studies/Special Reports (Traffic, Soils, Asbestos), 1991-1992
5000
45 A/E Selection, 1991
5000
45 % for Art/Correspondence, 1993
5000
45 Schedules (Project Time), 1991-1992
5000
45 OSBHE Correspondence, 1991
5000
45 OSBHE Correspondence, 1991
5000
45 Program (Architect Responsibility), 1989-1991
5000
45 Schematic Design, 1991
5000
45 Design Development, 1991-1992
5000
45 Design Review (In-House), 1991-1992
5000
45 Contract Documents, 1992
5000
45 Plan Review (In-House), 1992
5000
45 Equipment, 1992-1994
5000
45 Bid Preparation, 1992
5000
45 Addenda, 1992
5000
45 Construction Correspondence, 1993-1994
5000
45 Special Testing (Concrete, etc), 1992-1993
5000
45 Construction Meeting Notes, 1992
5000
45 Correspondence, Contractor, Const. Schedule, Sub List, Surety Letters, 1992
5000
45 Project Close-out (Punch List, Acceptance Recom., Board Accept.), 1993-1994
5000
45 Structural Calculations KPFF Project No.91421, 1992
5000
45 A/E Contract Correspondence, 1991-1993
5000
OSU Environmental Computing Center:, 1991-1994
Box
46 A & E Payments, 1993-1994
5000
46 Contract/Artist–Kim Hoffman, 1993
5000
46 Contract/Artist–Leo Osborne, 1993
5000
46 A/E Payments, 1991
5000
46 Contract/Artist–Frank Boyden, 1993
5000
46 Environmental and Engineering Services, Inc. Agreement, Supplement/Payment, 1996
5000
46 Endex Engineering, Inc., Agreement, Supplement/Payment, 1996
8000
gLAs Architectural Group, 1994-1996
Box
46 Agreement, Supplement/Payment, 1996
8000
46 1994 Agreement, Supplements for 1996, 1994-1996
8000
46 Correspondence, 1996-1997
2 folders
8000
46 Withycombe Correspondence, 1993-1996
8000
46 Withycombe Supplements/Payments, 1993-1996
8000
46 ISES Corporation Facilities Condition Audits, 1992-1996
8000
46 Lisa Bailey Architect Agreement, Supplement/Payment, 1995
8000
46 Marinello Engineering Agreement, Supplement/Payment, 1996
8000
McBride Architects, 1994-1996
Box
46 PC Agreement, Supplement/Payments, 1994-1995
8000
46 Correspondence, 1994-1996
8000
46 Various (Exterior Envelope Study of the Administration Building, Radiation Lab Reroofing Project and Roof Analysis Report), 1994-1995
8000
46 Agreement, Supplement/Payment, 1996
8000
47 McBride Architects Agreement, Supplement/Payments, 1990-1996
8000
47 MFIA Inc. Agreement, Supplement/Payment, 1996
8000
47 RSS Architecture Agreement, Supplement/Payments, 1994-1996
8000
47 Professional and Personal Services Contracts, 1992-1994
8100
47 The Balzhiser Group Agreement/Contract/Supplements, 1987-1992
8000
Parker Stadium Improvements, 1988-1993
Box
47 Correspondence, 1991-1993
7200
47 Misc., 1991
folder 1
47 Geotechnical Report-Proposed West Grandstand Stadium Cover and New Locker Room Facility, 1988-1992
47 Change Orders, 1991-1992
7200
47 Weekly Meeting Notes, 1991
7200
47 Correspondence, 1991-1993
7200
47 Payments, 1992-1993
7200
Parker Stadium Improvements, 1991
Box
48 Payments, 1991
2 folders
48 Construction Contract Set, Project Manual Volume I, 1991
48 General, 1991
48 Forest Research Laboratory, 1988-1992
Box
48 Remodel, 1991-1992
48 Proposal, 1991
48 Reroofing Project, 1988-1989
48 Restroom Remodel, 1991
48 Scanning Lab Renovation, 1991-1992
48 Scanning Lab Renovation Budgets, 1991-1992
48 Family Studies Center-Conversion of Kent House, etc. into Parking Lots, 1989-1992
48 Forestry Research Lab Specifications, 1994
Box
48 HVAC Modifications, undated
2 copies
48 Locker Room Remodel, undated
2 copies
48 Process Control Lab Remodel, 1994
2 copies
48 Benton Acoustics, Feasibility Study, 1993
48 Carkin Arbuckle Costic Architects, 1993-1994
Box
48 Benton Hall Renovation Correspondence, 1993-1994
8000
48 Correspondence, 1993-1994
8000
48 Supplement/Payments, 1993-1994
8000
Carlson/Veit Architects, 1993-1995
Box
48 Women’s Building Rooms 6/7 Remodel (Research Lab) Correspondence and Supplement/Payments, 1993-1995
8000
48 Carson Bekooy Gulick 1992 Agreement, 1994 Correspondence, 1994
8000
48 Cooling Feasibility Study, Weatherford Hall Dining Facility, 1994
8000
48 Carson Bekooy Gulick 1992 Agreement, 1992-1993 Correspondence, 1992-1993
8000
48 Carson Bekooy Gulick 1992 Agreement, 1994 Supplement/Payments, 1994
8000
49 Carson Bekooy Gulick 1992 Agreement, Supplement/Payments, 1992-1994
8000
49 Carson Suppl #6 Dryden Piping, 1989-1993
8000
CH2M Hill, 1993-1994
Box
49 HMSC Soil Testing, 1994
8000
49 Steam Line Correspondence and Supplements/Payments, 1994
8000
49 Condensate System Consultant Selection, 1993-1994
8000
49 Consultants reference (David Evans and Associates, Inc., John Graham Associates,, 1986-1987
Box
49 Interface Engineering, Inc., PAE Consulting Engineers Inc., Schuchart & Associates, SERA Architects, Van Gulik & Associates , Inc.), 1986-1987
49 Consulting Services, General, 1990-1991
8000
DEVCO Engineering, Inc, 1993-1994
Box
49 New Agreement, Supplement/Payments, 1994
8000
49 New Agreement, Correspondence, 1993
8000
49 Dearborn Motor Test, Consultant Selection, 1994
8000
49 DEVCO Engineering, Inc., Supplement/Payments, 1993
8000
49 Foundation Engineering, Inc., Property Administration Building Special Testing, 1994-1995
8000
49 McBride Ralston Correspondence, 1993
8000
49 UST Environmental Services, 1993-1994
8000
Dixon Aquatic Facility, 1990-1992
Box
49 Expansion Contract Correspondence, 1991
7200
49 Contract Correspondence, 1990
7200
49 Planning Correspondence, 1990
7200
49 Expansion Payments, 1991
7200
49 DDC Control System, 1992
Dixon Aquatics Facility, 1990-1993
Box
50 Expansion Payments, 1991-1993
7200
50 Expansion Project Manual, Specifications, Vol. 1 of 2, 1990
50 Expansion Project Manual, Details, Vol. 2 of 2, 1990
50 East Greenhouse Flat Roof Replacement, 1992
7200
Family Study Center, 1990-1993
Box
50 Artwork, 1990-1991
7200
50 Payments, 1991
50 Change Orders, 1991-1992
7200
50 Concrete/Steel Tests, 1990-1991
7200
50 Contract Correspondence, 1991-1993
7200
50 Project Manual/Signed Contract, 1990
Settecase Smith Doss, 1987-1994
Box
50 Parker Stadium End Zone Payments, 1989-1990
8000
50 Parker Stadium II Agreement/Supplements, 1990-1991
8000
50 Parker Stadium II Payments, 1990-1993
8000
50 Theatre Relocation Correspondence, 1990-1994
8000
50 Theatre Relocation Payments, 1991-1993
8000
50 Theatre HVAC Correspondence, 1992-1993
8000
50 Theatre HVAC Agreement/Payment, 1990-1993
8000
50 Parker End Zone Correspondence, 1987-1993
8000
50 Parker Stadium II, 1990-1992
8000
51 TBG Dixon Rec Aquatics Payments, 1989-1991
8000
Cordley Hall Reroofing Project, 1991-1993
Box
51 Signed Contract, 1991
17030
51 General, 1991-1993
7200
Cordley Hall Waterline Replacement, 1989-1991
Box
51 Signed Contract, 1992
51 General, 1991-1993
7200
51 Bids, 1991
7200
51 Cordley Seawater/Planning Correspondence, 1993
7200
Dixon Aquatics Facility, 1991-1993
Box
51 Artwork, 1991-1992
7200
51 Change Orders, 1991-1993
7200
51 Contract Correspondence, 1992-1993
7200
51 Dixon Recreation Center Corrosion Study, 1993
7200
52 Dixon Recreation Center Contract Correspondence, 1991-1992
7200
Family Study Center, 1989-1993
Box
52 Meeting Notes, 1991
7200
52 Payments, 1990-1993
7200
52 Planning Correspondence Yearly, 1989-1990
7200
52 Bid/Contract Correspondence, 1990-1992
17030
52 FRL Locker Room Remodel- bids, 1993
7200
52 Oregon State University FRL Locker Room Remodel- signed contract , 1993
7200
52 Forest Research Lab Locker Room Remodel, 1993
7200
52 FRC HVAC bid documents, 1993
7200
52 Oregon State University FRL HVAC Modifications - signed contract, 1993
7200
52 Forest Research Lab HVAC Modifications, 1993
7200
52 Forest Research Lab Remodels- Plan Stage, 1991-1992
7200
52 Gleeson Hall Reroofing-signed contract, 1991
53 Gleeson Hall Reroof, 1991
7200
53 Heating Plant Reroofing-signed contract, 1992
53 Heat Plant Reroof, 1992-1993
7200
53 Langton Stair Replacement-Bids, 1993
53 Langton Hall Exterior Stair Replacement-signed contract, 1993
7200
53 McAlexander Fieldhouse Painting & Roof Recoating-signed contract, 1992-1993
7200
53 McAlexander Fieldhouse Painting & Roof Recoating-signed contract, 1992-1993
7200
53 Administrative Services Lobby Renovation-signed contract, 1993
7200
53 Administrative Services Lobby Construction Correspondence, 1993-1994
7201
53 Ag Science II Contract Correspondence 1990, 1991
7200
53 Ag Science II DDC System Contract Correspondence 1991, 1991
7201
53 Administrative Services Lobby Payment/Change Order, 1993-1994
7201
53 Administrative Services Lobby Planning Correspondence, 1993-1994
7201
Ag Science II DDC System, 1990-1992
Box
53 General, 1990-1993
17030
53 Contract Correspondence, 1990, 1992-1994
7201
53 Payments, 1991-1992
7201
54 Ag Science II DDC System Payments 1991, 1991-1992
7201
54 Batcheller Hall and Covell Hall Reroofing-signed contract, 1993
7200, 7201
54 Burt Hall Piping Replacement-signed contract,, 1993-1995
7200, 7201
54 Coleman Field Parking Improvements-signed contract, 1994
7200
54 Coleman Field Parking Lot, 1994
7201
54 Ag Experiment Station, Consultant Services (Food Tox Lab), 1992
8000
54 Ag Experiment Station, Consultant Services, 1990-1991
8000
54 Master Plan Consultant-A Project Team Proposal, 1989
54 Master Plan Consultant-OSU Long Range Campus Master Plan Update, 1989
54 Ag Science II/RMC Consulting (Bob Cash), 1989-1990
8000
54 Ann Storrs, 1991-1992
8000
54 Architectural Consultant Selection, 1990
8000
54 Balzheiser and Hubbard Fire Alarm Systems, 1990
8000
54 Carson Suppl #2 Food Service Warehouse Freezer, 1990
8000
54 Carson Suppl #4 Weniger Growth Chambers, Room 635, 1988-1990
8000
54 Carson Suppl #4 Weniger Growth Chambers, Room 635, 1988-1990
8000
54 Corrosion Study of Transmission Pipes, 1986
54 Carson Suppl #30 FRL, 1986-1990
8000
54 Carson New Agreement/Payments, 1989-1990
17020
54 Subsurface Investigation-Proposed Bio. Science Bldg./Revised Compilation of Existing Soils Data and Summary of Subsurface Conditions, 1990
CH2M, 1986-1991
Box
54 Correspondence 1990, 1990
8000
54 New Agreements Payments, 1989-1991
8000
54 Suppl #2/16 Gilbert Condensate, 1986-1990
8000
54 Ed Carpenter, Artist, 1989-1991
8000
54 Fire Alarm System Consultant Selection, 1989-1990
8000
54 Geotechnical Study-Child Care Center, 1990
54 Geotechnical Study-Family Study Center, 1989
54 Geotechnical Investigation-Kerr Library Additions, 1991
7201
54 Fujitani Hilts & Assoc. Family Studies Center, 1989-1992
8000
54 James Graham 1990, 1988-1990
8000
55 K & D Engineering, Inc. Correspondence and Supplement/Payment, 1992
8000
55 Kerr Library Expansion Consultant Selection, 1990
8000
55 Mackensie Engineering (Formerly M/Saito), 1990
8000
55 Statement of Qualifications presented to OSU for Consulting Services for Roof Management Program, 1990
55 Marie Baxter/Todd Bartman, Artists, 1992
8000
55 McBride Ralston Payments/Supplements 1990, 1990
8000
55 Peavy Addn/Frl Consultant Selection, 1990
8000
55 Peterson Agreement/Supplement 1989, 1989
8000
55 Pittsburgh Testing Lab (Steel) , 1990-1992
8000
55 Roberta Kaserman, Artist, 1991-1992
8000
55 SRG Peavy Addition Correspondence, 1990
8000
55 Tyler, Douglas/ECE Artwork (included photos), 1992
8000
55 AG Experiment Station, Consultant SVCS, 1992
8000
55 Albert Duble, Acoustics Consultant, 1992
8000
Carson, 1986-1989
Box
55 Correspondence 1990, 1989
8000
55 Supplement 14/31, 1988-1989
17020
55 Supplement #23/26/27/28 AT&T, 1986-1989
8000
CH2M, 1986-1989
Box
55 Correspondence 1989, 1989
8000
55 Agreement/Supplement , 1986-1988
8000
55 Supp #18 Cordley Chillers, 1986-1989
17020
55 Suppl #19/29 FRL, 1988-1989
8000
55 Child Care Center Architect Selection, 1989
8000
55 Child Care Center Architect Selection, 1989
8000
55 Chris Billings & Associates, 1989
8000
55 Child Care Architectural Site, 1989
8000
55 Civil Engineering Consultant Selection, 1989
8000
55 Piper Jaffray Incorporated-Annual Report, 1990
55 Kerr Library Addition, 1989
8000
55 Statement of Qualifications for Engineering Consulting Services for the OSU Physical Plant, 1989
17020
55 Hill International, Inc., 1989
55 Roofing Replacement Consulting Services (Charles L. Youngman, Inc.), 1989
55 Consulting Services, General, 1989
8000
55 Prospectus for Energy Design Consultant (North American Energy Services), 1990
8000
55 Engineering Report for OSU Langton Hall Swimming Pool Balcony, 1989
55 DEVCO Correspondence Jan.-Jul, 1989
8000
56 DEVCO Correspondence Aug.-Dec, 1989
8000
56 LH Morrish Electric Inc., 1988
8000
56 Physical Plant Memorandum-Selection of Electrical Consultant, 1988
56 Electrical Consultant Selection, 1986-1989
8000
56 Endex Engineering, Inc. Misc., 1988-1989
8000
56 Family Studies Center Architect Selection, 1988-1989
8000
56 Foundation Engineering, 1988-1989
8000
56 Gazley, Plowman, Atkinson-Correspondence, 1987-1989
17020
56 Gordon & Associates, Inc., 1988-1989
8000
56 Kerr Expansion Contract Correspondence, 1991
7200
56 Administrative Services Lobby Consultant Selection, 1993
8000
56 Benton Acoustics Consultant Selection, 1993
8000
56 Resilience Tests Conducted on Artificial Playing Surface at Parker Stadium, 1990
56 Braun Intertec (Formerly NW Testing Labs), 1986-1992
8000
56 Carson Correspondence , 1990
8000
56 Carson Engineers Agreement, 1986-1989
8000
56 CH2M Agreement 1989, 1989-1991
8000
DEVCO, 1989-1990
Box
56 Correspondence, 1990
8000
56 Payments, 1989
8000
56 Supplemental Payment, 1989-1990
8000
57 DEVCO Supplemental Payment July-Dec, 1991
8000
57 GBD/Family Studies Center Correspondence Yearly, 1990-1992
8000
57 Geotechnical Study-Family Study Center, 1989
8000
57 GBD Family Study Center Correspondence Jan.-June , 1990
8000
McBride Ralston, 1990-1992
Box
57 New Agreement Payments, 1990-1991
8000
57 New Agreement Supplemental Payments, 1991
8000
50 Payments/Supplements, 1991-1992
8000
57 Michael & Lakeman Child Care Center Correspondence 1990, 1989-1990
8000
57 Professional Services Contracts, 1986-1991
8100
57 Robin Rickabaugh, Artist (Principia Graphica), 1988-1992
8000
Settecase Smith Doss/Ag Science II, 1987-1993
Box
57 Agreement/Supplement, 1987-1991
8000
57 Correspondence, 1991-1994
8000
57 Payments, 1991-1993
8000
TBG Dixon Rec Aquatics, 1988-1993
Box
57 Correspondence, 1988-1993
8000, 17020
57 Payments, 1992-1993
8000
58 Burt Hall Reroof-signed contract, 1992-1993
7200
58 Clark Lab Wall Repair and Reroof-signed contract, 1993
7200
58 Cordley Hall Chiller Replacement-signed contract, 1991
17030
58 Crop Science Parking Lot and Moreland Hall Parking Lot Improvements Project-signed contract, 1990-1991
17030
58 Moreland Hall Parking Lot Improvements-signed contract, , 1990
8000
Forest Research Lab Reroof and Glulam Replacement Project, 1990
Box
58 Signed Contract, 1990
58 General, 1990-1991
17030
58 Gilbert Hall Remodel-signed contract, 1989
8000
58 Gleeson Hall Entrance Reconstruction-Signed Contract, 1991
17030
Graf Hall Reroofing, 1990-1991
Box
58 Project Manual, 1990
17030
58 Signed Contract, 1990
17030
58 General, 1990-1991
17030
58 Handicapped Access Phase III “G” Waldo Elevator Payments/Change Ord, 1990-1991
17030
58 Prevailing Wage Rates for Public Works Contracts in Oregon, 1990
17030
59 Handicapped Accessibility Phase III Contract G-signed contract, 1990
17030
59 Handicapped Access Phase III Waldo Elevator Correspondence, 1990-1991
17030
59 Housing Service Building Loading Dock Reroof-signed contract, 1991
17030
59 Housing Service Building Loading Dock Roof, 1991-1992
17030
59 Strand Ag 111,113 and 113A, 1992
59 Strand Ag.-Admissions, 1991
17030
59 Strand Ag. Allocation-Journalism/Photography, Communication Arts, 1991
59 Strand Ag. Allocation-Water Resources, 1992
17030
59 Strand Ag. Solutions, 1991-1992
59 Cordley Back-Up, 1989-1991
59 Cordley Hall Solution, 1991-1992
17030
59 Weniger Hall Solution, 1991-1992
59 Weniger, 1990-1991
59 Ag. Science Aftermath, 1990-1992
59 Withycombe Exit, 1990-1991
59 Withycombe, 1991
59 Academic Affairs Space Search, 1990
59 Langton Women’s Lockers, 1991
59 Philosophy Dept. Computer Sci. Bldg, 1992
59 Driver Training Trailer, 1992
59 University Computing Steering Committee, 1992
59 Parking Structure, not dated
59 Snell #25/29, 1991
59 Langton Rm. 125 Women’s Gym, 1991
59 Gilmore, 1992
59 Gilmore Annex, 1992
17030
59 Gilmore Hits L & M, 1992
59 Education Hall, 1991
17030
Asia University Relocation to Education Hall, 4th Floor, 1991
17030
59 ELI/Snell Hall, 1991
59 Ballard Hall, 1991
59 Ballard Extension Hall-“College of Agriculture Spacial Analysis”, 1988-1989
59 Oceanography-Ballard Hall, Snell, Strand Ag, 1988
59 Cordley, 1984-1988
17030
59 Waldo Hall, 1990
59 Computer Science Building, 1990-1992
59 Oceanography, 1990-1991
59 Computer Science, 1990
59 Women’s Center/Benton Annex, 1988-1991
59 Moreland Hall, 1990
59 Social Science, 1990
59 Family Study Center, 1990
59 Development Office-Snell Hall, 1990-1991
59 Public Safety, 1991
59 7831 (Repairs-Cordley, Education Hall, Pharmacy), 1988-1990
59 State of Oregon Auditors, 1990-1992
60 Dryden Hall, 1991
60 Funding CH2M Hill Building, 1991
GBD Family Study Center, 1989-1992
Box
60 Correspondence, 1989-1992
8000
60 College of Home Economics, 1989-1992
8000
60 Agreement/Supplements, 1989-1990
8000
60 Proposal for OSU-Forest Research Laboratory, 1991
17030
60 Proposed Architectural/Engineering Services Forest Research Laboratory Renovation, 1991
60 FRL Renovation/AE Selection, 1991
8000
60 Howard & Kathleen Meehan Ag Science II Artwork, 1992-1993
60 Howard & Kathleen Meehan, Dixon Artwork, 1991-1993
8000
60 Johanson Fine Arts, 1991-1992
8000
60 McBride Ralston Correspondence, 1990
8000
Michael & Lakeman Child Care Center, 1990-1991
Box
60 Agreement, 1991
8000
60 Correspondence, 1991
8000
60 Supplements/Payments, 1990-1991
8000
Peterson Kolberg/Forest Research Lab Renovation, 1991-1994
Box
60 Agreement/Supplement, 1991-1992
8000
60 Correspondence, 1991-1994
8000
60 Payments, 1991-1993
8000
Settecase Smith Doss Ag Science II, 1987-1991
Box
60 Correspondence , 1991-1993
8000
60 Payments, 1988-1990
8000
60 Programming, 1987
8000
60 Arch Contract/Supplements, 1991
8000
60 Settecase Smith Doss/ECE Roof, 1993
8000
60 Withycombe Lab Planning Correspondence, 1992-1993
7201
60 Withycombe Toilet Remodel, 1993-1994
7201
60 Withycombe Hall Laboratory Remodel-signed contract, 1993
7200
61 Withycombe Lab Remodel, 1993-1994
7201
61 Withycombe Toilet Remodel Bids , 1993
61 Carlson/Veit Women’s Bldg 22/24 Correspondence, 1993-1994
61 Carlson/Veit Women’s B. 22/24 Supplement/Payments, 1993
8000
61 MU Kitchen Exhaust Hood Analysis, 1992
8000
61 Pharmacy-Fume Hoods Study and Preliminary Cost Estimate, 1992
17020
61 Moreland-Heating Venting Report/Remedies, 1992
8000
61 Carson Correspondence 1992 , 1992-1997
8000
61 Carson Supplemental Payments, 1989-1992
8000
61 Cordley Piping Consultant Selection, 1992
8000
DEVCO, 1992-1993
Box
61 Correspondence, 1992
8000
61 New Agreement Correspondence July-Dec., 1992
8000
61 New Agreement Supplement/Payments, 1992-1993
8000
61 1989 Agreement Supplement Payments, 1992-1993
8000
61 DEVCO/Industrial Bldg. Correspondence, 1992-1993
8000
61 DEVCO/Industrial Bldg. Agreement/Payments, 1992-1993
8000
61 Balzhiser & Hubbard 96 Agreement Supp/Pay 96, 1996
8000
61 Balzhiser & Hubbard 94 Agreement Supp/Pay 95/96, 1995-1996
8000
Benchmark Arch, 1995-1996
Box
61 Correspondence through , 6/30/96
8000
61 1996 Agreement Supplement/Payment , 1996
8000
61 Supplements/Payments, 1995-1996
8000
62 Braun Intertec 1994 Agr. Suppl/Pmt , 1996, through 9/30/96
8000
62 Braun Intertec 1994 Agr. Suppl/Pmt 1996, 10/1/96 - 12/31 96
8000
62 Braun Intertec , 1993-1995
8000
62 Carson Correspondence, 1996
8000
62 College Inn Mechanical Systems Upgrade, 1995
62 Bexell Accessibility Study, 1995
62 Carson 94 Agreement Supplement/Payment, 1995
8000
62 Carson Bekooy Gulick 1994 Agreement Supplement/Payment 1994, 1996
8000
62 Carson Supplement/Payments for 1993, 1993
8000
62 CH2M Hill Condensate System Supplement/Payments for 1994, 1994
8000
62 CH2M Hill Condensate System Supplement/Payments for 1994, 1994
8000
62 Cordley Renovation, 1995
8000
62 Century West Construction, 1995
8000
62 Consulting Services, General 1992-1995
8000
62 Engineer Consultants, 1992
8000
Carson, 1990-1992
Box
61 Correspondence, 1991
8000
61 New Agreement/Payments, 1991-1992
8000
61 Supplement, #1 Pharmacy Piping, 1989-1991
8000
61 Supplement, #5 Cordley Chiller, 1990-1992
8000
61 Supplemental Payments, 1991
8000
62 CH2M Correspondence Yearly, 1990-1991
8000
62 Energy Consultant Selection, General Consultant Services, 1990
8000
63 Consultants for Energy Management System Improvements, 1990
63 DEVCO Correspondence, 1990-1992
8000
63 DEVCO 1989 Agreement, Payments, 1989-1991
8000
63 Methods and Forms Documentation for OSSHE and OSU Facility Condition Analysis, 1990
63 Proposal for Facilities Engineering Services for a Seismic Assessment of the OSU/FCA Buildings , 1990
63 ISES/Facilities Condition Audit, 1989-1990
8000
63 James Stephenson, Gladys Valley Artwork, 1993-1995
8000, includes photos
63 Jerry Meyer, Theater Artwork, 1993-1994
8000, includes photos
63 Mike’s Heating and A/C, 1991-1993
8000
63 Campus Development Plan, 1989 Update, 1989
63 Long Range Campus Development Plan Consultant Selection, 1989-1990
8000
63 Submittals for OSU Long Range Campus Master Plan Update, 1989
63 Long Range Campus Plan Proposal, 1989
Agricultural Sciences II, 1990-1993
Box
63 Project Manual Volume 1, Signed Contract, 1990
8000
63 Lighting Problem Review Documents, 1991-1992
7200
63 Observation Reports, 1991
7200
63 Payments, 1991-1993
7200
Agricultural Sciences II, 1987-1992
Box
64 DDC System, Signed Contract, 1990
7200
64 Artwork, 1988-1992
7200
64 Change Orders, Jan.-April, 1990-1992
7200
64 Contract Correspondence, 1990, 1992-1994
7200
64 Building Consultants, 1987
8000
Map Case
* Schematic Design Phase Approval(with signatures), undated
65 Grant Application, 1989-1992
7200
65 Change Orders, 1990-1992
7200
65 Concrete/Steel Tests, 1991-1992
7200
65 Proposal for the Construction, 1988
65 Concrete/Steel Tests, 1990-1991
7200
65 Contract Correspondence, 1990-1992
7200
Parker Stadium Storage Bay Enclosure, 1993-1994
Box
65 Signed Contract, 1993
7200
65 Bid, 1993
65 General, 1993-1994
7201
65 Radial Brick Chimney Removal, Signed Contract, 1994-1995
7200, 7201
65 Rogers Hall Reroof, Signed Contract, 1994-1995
7200. 7201
65 Sackett/Nash Parking Improvements, Signed Contract, 1994
7200
66 Strand Ag. Room 106 Remodel, 1993
7201
66 Strand Hall Rooms 107/109 Renovations, Signed Contract, 1993
7200
66 Strand Ag. Rooms 107/109 Remodel, 1993-1994
7201
66 1994 Street and Parking Lot Pavement Patching, Signed Contract, 1994
7200
66 1994 Street and Lot Patching, 1994-1995
7201
66 Weatherford Dining Cooling Improvements, Bid and Signed Contract,, 1994
7200
66 Weatherford Dining A/C, 1994
7201
66 Bid for Weniger Hall 118-122 A/C, 1993
7200
66 Sackett/Nash Parking Improvements Project, 1993-1995
7201
66 Weniger Hall 118-122 A/C, Signed Contract, 1993-1994
7201
66 Weniger Operation and Maintenance Manuals, 118-122 A/C, 1994
7201
66 Base Bids - Service Master, 1992
4 folders
11200
67 Base Bids - Service Master, 1991-1993
7 folders
11200
67 Gill Coliseum Elevation Repairs, Signed Contract, 1996-1997
7200
Horse Barn Addition, 1994-1996
Box
67 Bids, 1995
7200
67 General, 1995-1996
7200
67 Signed Contract, 1994-1995
7200
67 Housing Buildings Stair Tower Repairs, Signed Contract, 1996
7200
67 Housing Stair Cracks, 1995-1996
7200
Langton Hall Masonry Restoration, 1993-1996
Box
67 General, 1993-1996
7200
67 Signed Contract, 1993
7200
67 Langton Hall Room 300 Painting, Signed Contract, 1996
7200
67 Langton Gym Painting, 1996-1997
7200
Milam Hall Third Floor Remodeling, 1995-1996
Box
67 Bids, 1995
7200
67 Project Manual, 1995
7200
68 Milam 3rd floor Remodel (pulled drawing), 1995-1996
7200
68 Nash Cornice Repairs, 1996
7200
68 Oregon State University Oceanography Administrative Building, 1994
7200
68 Oregon State University Ocean Administration Building Repipe, 1996
7200
68 Oceanography Warehouse Building Reroof, 1995-1997
Star Café (Memorial Union), 1994-1995
Box
68 General, 1994-1995
7200
68 Correspondence, 1995
7200
68 Payments/Change Orders, 1995
7200
68 Strand Hall Reroofing/Cornice Restoration,, 1993-1997
7200, 7201
68 Strand Hall Reroofing and Cornice Repair-signed contract, 1994
7200
68 Strand Roof Clarification Requests & Change Order Quotes, 1994
7201
68 Strand Remodels, Planning Correspondence, 11993
7201
68 Valley Football Center Water Heater Replacement-signed contract, 1995
7200
69 Valley Football Center Water Heater Replacement, 1995
7200
69 Veterinary Research Lab Reroof-signed contract, 1994
7200
69 Veterinary Research Lab Reroof and Animal Resource Center Repair, 1994
7200
69 Withycombe Hall Laboratory Remodel, 1993
7200
69 Withycombe Toilet Room Remodel-signed contract, 1993
7200
69 Women’s Building 6/7 Remodel (Research Lab) includes signed contract, 1993-1994
7201
69 Gordon & Associates Supplements Seed Lab, 1989-1990
8000
69 HMSC Library Consultant, 1989
8000
69 James Graham Architects, 1978-1989
8000
69 Larry Kirkland Architects, 1987-1988
8000
69 Mechanical Consultant Selection, 1988-1989
8000, 17020
69 Northwest Engineering, 1989
8000
69 Paraclete Engineering Agreement, 1989
8000
69 Parker Stadium Architect Selection, 1989
8000
69 Parking Structure Consultant Selection, 1987-1988
8000
69 Peterson Engineering. Correspondence, 1989
8000
69 Sahara Corvallis Partnership (CH2M Hill Bldg), 1990
8000
69 Sera Architects, 1988
8000
9 Settecase/Smith/Doss Ag. Science II Correspondence, 1987-1988
17020
TBG/Fish Disease Lab, 1987-1989
Box
69 Payments, 1989
8000
69 Correspondence, 1987-1989
8000
Benton Hall Room 303, 1991
Box
69 Renovation-signed contract, 1991
8000
69 Remodel, 1991
17030
Child Care Center, 1988-1992
Box
69 Change Orders, 1991
17030
69 Concrete/Steel Tests, 1991
17030
70 Payments, 1991-1992
17030
70 Contract, 1991-1992
17030
70 Planning Correspondence, 1988-1990
17030
70 Signed contract, 1990
17030
70 Planning, 1990
70 Contract Correspondence, 1990-1991
17030
71 Electrical and Computer Engineering Building (ECE) Roof Modifications, 1993-1995
71 ECE Building Roof Modifications, 1992
Signed Contract
71 Above Ground Fuel Tanks Phase II-Piping, 1993
71 Fuel Tank Piping, 1993
71 Project Proposal: Above Ground Fuel Storage Tank, Phase III, 1995
72 Fuel Storage Tanks Phase III (Piping) , 1993-1995
72 Fuel Tanks (Planning Correspondence), 1993
72 Gill Coliseum Parking Lot Repair, 1995
Signed Contract
72 Gill Coliseum Parking Lot, 1995-1996
72 Gill Coliseum & Heating Plant Parking Lot Repair, 1995
Signed Contract
72 Heat Plant Parking Lot, 1995
72 Kerr Library Roof Repair, 1995
72 Kerr Library Roof Repair, 1995
Signed Contract
72 Animal Resource Center Capital Repair, 1994
Project Manual
72 Animal Resource Center Reroof, 1994-1996
7200
72 Rogers/Snell Hall Elevator Up-Grade, 1994
Signed Contract and Correspondence
72 Sackett Hall Water Heater Installation, 1994
Signed Contract and Correspondence
72 Shop Buildings Reroof, 1995-1996
Signed Contract and Correspondence
72 Street and Parking Lot Pavement Patching, 1995-1996
7200
72 Benton Slope Irrigation, 1995-1996
Signed Contract and Correspondence
72 Boiler Chimney Stack InstallationBoiler Chimney Stack Installation, 1994-1995
Signed Contract and Correspondence
73 Condensate Return System, 1994
73 Cordley Hall Piping Replacement, 1994-1995
73 Dixon Recreation Center Reroof, 1993-1995
Signed Contract and Correspondence
73 Dryden Hall Piping Replacement, 1993-1994
Signed Contract and Correspondence
73 Horn Barn/Riding Arena Reroof Project, 2000-2001
73 Hyslop Farm Hoods, 2001
73 Kerr Admin. Lobby, 2001
74 Kidder Hall Reroof,, 1999-2000
Project Manual and Correspondence
74 Langton Hall HVAC—Rebid, 1998-2000
Signed Contract and Correspondence
74 McNary Dining Hall Phase III (Cont., 2000-2001
Project Manual and Correspondence
74 Owen Hall Data Cabling, 2000
74 Peavy Hall Telecommunications Wiring Systems and Rebid, 2000-2001
74 Reser ADA Phase II Upgrade, 2001-2002
74 Pharmacy Bldg Third Floor Classroom Remodel Project, 1999
Signed Contract
74 Sackett Hall Reroof & Waterproofing Project, 1999
Signed Contract and Project Manual
74 Snell Hall 5th Floor Remodel, 2000-2001
Signed Contract and Correspondence
74 Social Science Building Access, Walk & Related Site Improvements, 2000
75 Laboratory Strong Floor-Hinsdale Wave Lab, 2001-2002
Signed Contract and Correspondence
75 Wiegand Entrance Canopy Repair, 1999-2000
Signed Contract and Project Manual
75 Weniger Hall 3rd Floor Remodel, 2000-2001
Signed Contract and Correspondence
75 Women’s Bldg Basement Remodel Project, 1999-2000
Signed Contract and Correspondence
75 Women’s Bldg Lighting Upgrade, 2000-2001
Signed Contract and Correspondence
75 Crop & Soil Sciences Bldg Lab Remodel Rooms 242, 246;, 1999-2000
Signed Contract and Project Manual
75 Cordley Hall 4th Floor Remodel, 2000-2001
Signed Contract and Correspondence
75 Cordley Hall 5th Floor Remodel, 1999-2000
Signed Contract, Project Manual, Correspondence, and Submittals
76 Gill Coliseum Room 132 Remodel, 2000-2001
Signed Contract and Correspondence
76 Graf Hall Piping Replacement, 2000-2002
Signed Contract and Correspondence
76 House Sites Restoration, 1999-2000
Signed Contract and Correspondence
76 Pharmacy 3rd Floor Classroom, 1999
124 Contract Insurance Reports (7100 series), 1987-1994
Advertised Construction (7200 series), 1993-2002
Box
124 Administrative Services Lobby ADA Renovation
124 Batcheller Hall Cornice Repair
124 Book Storage Shelving Construction
124-125 Dearborn Motor Pool Test Facility
125 Finley Hall Piping Rehabilitation, 2001-2002
125 West Hall Remodel, 1996-1998
125 LaSells Stewart Center Reroof, 1997
125 Sackett Hall Fire Alarm System, 1997
125 Sackett Hall Reroof, 1997
125 15th and Washington Parking Lot, 1997
125 26th Street Reconstruction, 1997-1998
126 Administration Building Roof Repair, 1996-1997
126 Peavy Hall Field Irrigation, 1996-1997
126 President's Residence, 1996-1997
126 Radiation Center Parking Reconstruction, 1995-1996
126 Street and Parking Lot Pavement Patching, 1996
126 Women's Field Irrigation, 1994-1996
126 Withycombe Hall Reroof, 1995-1998
126 Strand Hall Classroom Retrofit, 1993
126 Langton Hall HVAC Upgrade, 1996
126 Education Hall Exterior Restoration Phase I and II, 1994-1995
127 Fairbanks Hall Exterior Restoration, 1993-1996
127 Fish Hawk Creek Bridges, 1996-1997
127 McAlexander Fieldhouse - New Ventilation System for ROTC Target Range, undated
127 Forestry Research Lab Chemical Storage, 1995-1998
127 Forest Research Office Addition, 1995-1996
127 East Greenhouse Parking Lot Upgrade, 1996
127 Dixon Recreation Center Renovation - Package 1,
128 Forest Ecosystem Research Lab (FERL) Biological Waste Tanks
128 Forest Research Lab Reroof
128 Gilmore Hall Fire Escape Replacement
128 Hatfield Marine Science Center Exhibit Lighting
128 Magruder Hall I.V. Support
128 McNary Hall Remodel Phase
128 Rowing Tank
128 Weniger Hall 5th Floor Air Conditioning
128 Education Hall Entry Canopy
128 Graf Hall Room 101 Remodel
128 Snell Hall Roof Repair
128 Withycombe Hall Sitework - Parking Lot
Architects and Engineers (8000 series), 1994-1996
Box
129 Walker and Macy - Long Range Plan
129 Strand Classroom Remodel Architect Selection
129 Devco: Structural Evaluation of Exterior Wall Cracks - Callahan, Wilson, McNary Halls
129 Devco: 1992 Agreement Supplement/Payment, 1995
129 Devco: 1994 Agreement Supplement/Payment, 1994-1996
129 Devco: 1996 Agreement Supplement/Payment, 1996
129 Devco: Correspondence, 1995
129 Devco: New Agreement Correspondence, 1994
129 Brown and Caldwell: Proposal for Engineering Design Services for Memorial Union Sanitary Sewer Repair
Contract Proposals and Statements of Qualifications, 1993-1995
Box
130 Forest Ecosystem Research Laboratory, 1994
130 University Housing and Dining Renovation, 1995
130 Women's Crew Team Locker Room and Boat House Facility, 1994
130 Memorial Union West Wing and Commons Renovation, 1993
Closed Project Files, 1993-1995
Documentation with contracts and project acceptance forms.
Box
131 Women's Building ADA Upgrade
131 Radiation Center Parking Reconstruction
131 Agricultural Sciences II DDC System
131 McAlexander Fieldhouse Painting and Roof Recoating
131 Environmental Computing Center
131 Dryden Hall Pipe Replacement
131 Burt Hall Pipe Replacement I and II
131 Batcheller and Covell Halls Reroof
131 Langton Hall Masonry Restoration
131 Milam and Strand Halls Storms Sewer
131 Administrative Services Lobby Revisions
131 Strand Hall Rooms 107 and 109
131 Cordley Hall Pipe Replacement
131 Women's Building Room 6/7 Remodel
131 Strand Hall Reroof and Cornice Repair
131 Campus Condensate Return System Replacement Phase I
131 Sacket and Nash Parking Improvements
131 Coleman Field Parking Improvement
131 Parker Stadium Grandstand Seating
131 Lab Animal Resource Repairs
131 Property Administration Building
131 Radial Brick Chimney Removal
131 Boiler Stack Installation
131 Star Cafe Remodel
131 Langton Hall ADA Upgrade
131 Fish Disease Lab Office Upgrade
131 Office Lab at SOES
131 Dry Cow Barn - Dairy Center

^ Return to Top

Series III:  Building Specifications and Reports, 1909-2003
12 cubic feet, including 8 photographs  ( 15 boxes and 1 map folder)

Series III consists of building specifications for construction and renovation of various OSU buildings and structures and reports regarding campus planning, proposed structures, campus traffic flow, building accessibility for the disabled, and planning reports by the City of Corvallis. Building specifications for the construction of numerous campus buildings in the 1950s through 1970s are included, such as the residence halls, Cordley Hall, Dixon Recreation Center, Kerr Library, Nash Hall, Peavy Hall, the Radiation Center, Rogers Hall, Snell Hall, the Veterinary Medicine teaching hospital, Weniger Hall, and Wilkinson Hall. The series also includes specifications for several structures completed in the 1920s and 1940s, such the Dairy, Horse, and Sheep Barns; Covell Hall, Gill Coliseum, and Sackett Hall. This series includes the 1909 campus plan by the Olmsted Brothers landscape architects.

Container(s)
Description
Individual Campus Buildings, 1952-1987
Administration Building (Kerr), 1967-1971
Box
77 Schematic Design Study, undated
Hewlett and Jamison, architectural firm
77 Cost Study for Proposed Administration Building, 1967
Oregon State Board of Higher Education
77 Sanitary Sewer Extensions, 1970
Oregon State Board of Higher Education
77 Agreements and Receipts for Administration Building Furnishings/Hardware, 1971
Box
77 H. J. Andrews Experimental Forest Administrative Site, 1980
OSU Planning and Institutional Research
Apperson Hall, 1963-1986
Box
77 Feasibility Study for Apperson Hall, 1963
Bear, McNeil, Schneider, Bloodworth, & Hawes; Architects
77 Apperson Hall & Merryfield Hall Alterations, 1986
Jeppsen, Miller, & Tobias, Architects
Arnold Hall, 1968-1970
Box
77 Arnold Hall Cafeteria - Specifications, 1970
Bear, McNeil, Bloodworth, & Hawes, Architects
77 Arnold Hall - Cafeteria , 1968
Bear, McNeil, Bloodworth, & Hawes, Architects
77 Avery and Dixon Houses - Specifications, 1965
Architects Hamlin & Martin
77 Azalea House - Specifications, 1952-1953
Gathercoal & Jeppsen Architects
Batcheller Hall, 1986-1987
Box
77 Alterations: Project Manual, 1986
77 Cornice Restoration and Benton Hall Re-roofing and Exterior Repairs, 1987
Soderstrom Architects
77 Benton Hall Feasibility Study, 1964
Bear, McNeil, Schneider, Bloodworth & Hawes Architects
77 Bexell Hall Heating Control Study, 1974
Bloss Residence Hall , 1968-1971
Box
77 Unit No. 3 Complex A- The Presidents’ Complex, 1968
Bear, McNeil, Bloodworth, & Hawes, Architects
77 Specifications, 1970
Bear, McNeil, Bloodworth, & Hawes, Architects
77 Specifications for Interior Furnishings and Installation, 1971
Bear, McNeil, Bloodworth, Hawes & Peterson, Architects
77 Buxton Hall Dormitory Unit #4 - General Specifications and those for Built-In Furniture and Interior Furnishings, 1961
3 reports - Burns, Bear, McNeil, & Schneider, Architects
77 Cauthorn Hall Lounge Alterations- Specifications, 1966
Bear, McNeil, Schneider, Bloodworth, & Hawes, Architects
77 Clark (Meats) Laboratory - Specifications, 1966
Jeppsen & Miller, Architects
77 Computer Science Building Alterations, 1986
Jeppsen, Miller & Tobias, Architects
Cordley Hall, 1956-1965
Box
77 First Addition to Cordley Hall-Specifications, 1965
2 reports-Bear, McNeil, Schneider, Bloodworth and Hawes, Architects
77 Agricultural & Biological Science Building (Cordley)- Specifications, 1956
Burns, Bear, McNeil & Schneider Architects
78 Cordley Hall First Addition, Application for Grant Higher Education Facilities Act of 1963 , 1967
Oregon State System of Higher Education
78 First Addition and Second Addition to Cordley Hall, 1962
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects, 1 photo of First and Second Addition
78 Exhaust and Cross Contamination Study: Cordley Hall Unit I, Gilbert Hall, and Weniger Hall, 1973
(Morrison, Funatake & Associates, Inc.) (7 photos of pipes and wires
Crew (rowing) Facility, 1964-1986
Box
78 Specifications, 1964
Oregon State System of Higher Education
78 Crew Shell/Shelter Shop, 1986
78 Crop Science Building , 1979
Martin, Schultz & Geyer, Architects
78 Dairy Center - Specifications , 1968
Zaik and Miller, Architects
Dearborn Hall, 1974-1986
Box
78 Dearborn Hall Alterations, 1986
Jeppsen, Miller & Tobias, Architects
78 Dearborn Hall Renovation, 1974
Farnham and Oliver Architects
Dixon Recreation Center , 1970-1973
Box
78 Building Program, 1970-1973
Planning and Institutional Research
78 Preliminary Specifications, 1972
Balzhiser, Longwood, Smith, Paul, and Anderson, Architects
78 Intramural/Recreation Building Specifications, 1973
, Longwood, Smith, Paul and Anderson, Architects and Planners
78 Dormitory Services Building-Specifications, 1960
Burns, Bear, McNeil, & Schneider, Architects
78 Education Hall Exterior Wall Waterproofing, 1964
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
Electrical and Computer Engineering Building, 1985-1986
Box
78 Project Manual Volumes I-II, 1986
Settecase, Smith, and Doss, Architects
78 Electrical and Computer Engineering Building Solar Energy Analysis of Central Atrium with Glazed Roof, 1986
Gregory Acker, Architect
78 Electrical and Computer Engineering Building Program, 1985
Office of Planning and Institutional Research
78 Environmental Fluid Dynamics Laboratory Building Specifications, 1972
State Board of Higher Education
78 Fairbanks Hall Feasibility Study, 1963
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
Family Study Center (Bates Hall), 1962-1990
Box
78 Design Program and Description, 1962
Jeppsen and Miller, Architects
78 Building Program, 1988
Prepared for the College of Home Economics by Ray Glass
78 Design Development Proposal, 1989
2 folders
GBD Architects
78 Project Manual for Family Study Center, 1990
GBD Architects
78 Farm Crops Building Feasibility Study, 1964
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
Finley Residence Hall, 1965-1966
Box
78 Residence Hall Proposal and Design, 1965
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
78 Residence Hall Specifications, 1966
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
79 Food Toxicology and Nutrition Lab - Specifications for Concrete and Plumbing Work for Trout Hepatoma Laboratory, 1963
(P. Daniel Read, Architect
Gilbert Hall, 1974-1980
Box
78 Gilbert Hall Addition, 1978-1980
Zimmer, Gunsul, Frasca Partnership, Architects
78 Gilbert Hall Renovation, 1980
Zimmer, Gunsul, Frasca Partnership, Architects
78 Feasibility Study, 1974
Planning and Institutional Research
78 Building Specifications, 1974
Planning and Institutional Research
Gill Coliseum, 1966-1984
Box
79 Gill Coliseum Additions and Alterations- Project Manual, 1984
Settecase, Smith, Doss Architecture
78 Review of Existing Structure, 1984
CH2M
78 Residence Hall Specifications, 1966
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
79 Graf Hall Alterations, 1986
Jeppsen, Miller, & Tobias, Architects
Greenhouse and Service Buildings, 1964
Box
78 Specifications: Greenhouse and Service Buildings: West Range Second Unit to 1964 Additions, 1964
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
78 Specifications: Greenhouses & Service Buildings: West Range 1964 Additions , 1964
Bear, McNeil, Scheider, Bloodworth & Hawes Architects
Hatfield Marine Science Center, 1962-1980
Box
79 Presentation of a Site Development Plan for the Yaquina Marine Sciences Laboratory South Beach Site Oregon State University, 1962
Cornell, Howland, Hayes & Merryfield
79 State of Oregon Board of Higher Education Contract Documents for the Construction of a Dock and Approach at the Oregon State University Yaquina Bay Marine Sciences Laboratory, 1963
Cornell, Howland, Hayes & Merryfield
79 Oregon State University Yaquina Bay Marine Science Laboratory Newport: Preliminary Scheme Prepared for Presentation to the State Board of Higher Education, 1965
Cornell, Howland, Hayes, & Merryfield
79 Building Program Marine Science Center Improvements, 1968
OSU Planning & Institutional Research
79 Specifications Underground Cable System at Marine Science Center Oregon State University, 1968
Office of University Engineer Physical Plant Department
79 Project Program Aquaculture Research Facility, 1977
OSU Planning and Institutional Research
79 Newport Research Support Facility National Marine Fisheries Service Northwest & Alaska Fisheries Center: Newport: Construction Documents Phase, 1980
Hewlett, Jamison, Atkinson & Luey
79 General Documents and Specifications for Marine Science Center Housing, 1972
Hewlett, Jamison & Atkinson, Architects
79 Specifications for Marine Science Laboratory and Service Building, 1963
Hewlett & Jamison, Architects
79 Specifications for Meeting/Dining Building, Marine Science Center, 1976
Hewlett, Jamison, Atkinson & Luey, Architects
79 Specifications for Marine Science Laboratory and Service Building, 1963
Hewlett & Jamison, Architects
79 National Marine Fisheries Service Northwest and Alaska Fisheries Center, Newport Research Support Facility, 1980
Hewlett, Jamison, Atkinson & Luey, Architects
Hawley Hall, 1958-1959
Burns, Bear, McNeil & Schneider, Architects
Box
80 Specifications for Men’s Dormitory, Unit “3,” , 1958
Burns, Bear, McNeil & Schneider, Architects
80 Specifications for the Interior Furnishings Women’s Residence Hall and Dining Hall/Men’s Dormitory, Unit “3,” , 1959
Burns, Bear, McNeil & Schneider, Architects
80 Specifications for Built-in-Furniture Men’s Dormitory, Unit “3,” , 1958
Burns, Bear, McNeil & Schneider, Architects
80 Heating Plant - Specifications for Central Heating Plant Addition, 1959
Burns, Bear, McNeil & Schneider, Architects
Hinsdale Wave Research Laboratory, 1972-1987
Box
80 Contract Documents for the Construction of the Oregon State University Environmental Fluid Dynamics Laboratory Concrete Wave Tank , 1972
Cornell, Howland, Hayes & Merryfield
80 Project Manual for the O. H. Hinsdale Wave Research Laboratory, West Wing, 1987
Settecase Smith Doss Architecture
80 Horse Center - Project Manuals for Proposed Horse Center for Oregon State University, 1971
2 reports-Morin, Longwood, Edlund, Architects
80 Kidder Hall - Specifications for 1964 Former Library Building Remodel: Sets 1 and 2, 1964
2 reports-Hewlett & Jamison, Architects
Lab Animal Resource Center, 1959
Box
80 Specifications for Animal Care Facility, 1973
Balzhiser, Longwood, Smith, Paul and Anderson, Architects
80 Animal Care Facilities Specifications Architectural, Structural, Mechanical, Electrical Detail Drawings and Schedules, 1974
Balzhiser, Longwood, Smith, Paul and Anderson, Architects
80 Langton Hall - Proposal for Program Analysis and Feasibility for the Addition of a Competition Swimming Pool Facility to Langton Hall, 1975
Atelier/Northwest, Architects
LaSells Stewart Center, 1979-1980
Box
80 Oregon State University Foundation Cultural and Conference Center, 1980
Skidmore, Owings & Merrill, Architects
80 Specifications for Cultural Center, Oregon State University Foundation, Volumes I-II, 1965-1970
3 reports-Skidmore, Owings & Merrill, Architects
Library Buildings, 1965-1970
Box
80 Specifications for Oregon State University Library, First Addition, 1970
Hamlin, Martin& Schultz, Architects
80 New Library Building for Oregon State College, 1965
Hamlin & Martin, Architects
Memorial Union, 1959-1981
Box
80 Specifications for Memorial Union Remodel, Phase III, 1980
Jeppsen, Miller & Tobias, Architects
80 Specifications for General Work: Additions to Memorial Union Building,, 1959
Church, Newberry, Roehr and Schuette, Architects
80 Specifications for Mechanical Work: Additions to Memorial Union Building, 1959
Church, Newberry, Roehr and Schuette, Architects
80 Specifications for Electrical Work: Additions to Memorial Union Building, 1959
Church, Newberry, Roehr and Schuette, Architects
81 Specifications for Food Service Equipment: Additions to Memorial Union Building, 1959
Church, Newberry, Roehr and Schuette, Architects
* Traffic Flow Pattern (for food service), undated
1 map folder
81 Specifications for Acoustical Ceiling Commons Room, Memorial Union Building, 1965
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
81 Specifications for Memorial Union Remodel Phase IV, 1981
Jeppsen, Miller & Tobias, Architects
81 Specifications for Student Union Facilities, Phase II: Memorial Union Alterations and Additions, 1978
Jeppsen, Miller & Tobias, Architects
81 Student Union Facilities: Alterations and Additions, 1976
2 folders
Jeppsen, Miller and Tobias, Architects
81 Merryfield Hall and Annex - Feasibility Study for Production Technology, 1964
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
81 Mitchell Playhouse - Feasibility Study for Mitchell Playhouse, 1963
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
Nash Hall, 1966-1968
Box
81 Specifications for Bioscience Building for Oregon State University, 1968
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
81 Bio Science Building Specifications, 1966
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
National Forage Seed Production Research Center, 1984-1985
Box
81 Mechanical and Electrical Bid Invitation for National Forage Seed Production Research Center, Oregon State University Campus, 1985
Moreland, Unruh and Smith, Architects
81 USDA National Forage Seed Production Research Center Conceptual Design, 1984
Moreland, Unruh and Smith, Architects
81 USDA National Forage Seed Production Research Center Detailed Facilities Program,, 1984
Moreland, Unruh and Smith, Architects
81 USDA National Forage Seed Production Research Center Calculations, 1984
Moreland, Unruh and Smith, Architects
81 USDA National Forage Seed Production Research Center 35% Design Submittal, 1984
Moreland, Unruh and Smith, Architects
Oceanography Building, 1962-1985
Box
81 General Specifications, 1962
Jeppsen & Miller, Architects
81 Mechanical Systems Testing and Adjusting Data for Oceanography II Building, 1985
Jeppsen, Miller and Tobias, Architects
81 Electrical Specifications for Oceanography Building at Oregon State University, , 1962
Jeppsen and Miller, Architects
81 Fixed Equipment Contract - Specifications for Oceanography Building at Oregon State University, 1962
Jeppsen and Miller, Architects
81 Mechanical Specifications for Oceanography Building at Oregon State University, 1962
Jeppsen and Miller, Architects
Orchard Court Apartments, 1960-1963
Box
81 General Contract - Specifications for 1963 Addition to Married Student Housing Project, 1963
Jeppsen and Miller, Architects
81 Specifications and Contract Documents: General, Mechanical, and Electrical Work for Married Student Housing Project, 1960
Jeppsen and Miller, Architects
81 Orchard Court Community Center - Building Program for Orchard Court Community Center, 1972
OSU Planning and Institutional Research
82 Ornamental Plants Research Facility - Construction Bids, 1972
Administrative Services Division Procurement and Personal Property Management Branch-Contracting Unit
82 Oxford House - Specifications for the Alterations to Oxford House, 1966
Dukehart & Kinne, Architects
Parker Stadium, 1966-1971
Box
82 Stadium Improvements: Parker Stadium, Oregon State University and Autzen Stadium, University of Oregon, 1969
Moffatt, Nichol & Bonney, Inc., Consulting Engineers
82 Parker Stadium Addition, 1967
(Donald J. Zarosinski, Consulting Engineer
82 End Zone Corner Seats, Parker Stadium, 1966
Donald J. Zarosinski, Consulting Engineer
82 General Documents and Specifications for OSU Stadium Concessions and Ticket Booth,, 1966
Hewlett & Jamison, Architects
82 Oregon State University Parker Stadium Parking, 1971
Cornell, Howland, Hayes & Merryfield
Peavy Hall, 1968-1976
Box
82 Forestry Sciences Laboratory Service Building, 1974
U.S. Department of Agriculture - Forest Service
82 Specifications for Forestry Building, Oregon State University, 1969
Hamlin, Martin & Schultz, Architects
82 Forestry Sciences Laboratory North Wing, 1970
U.S. Department of Agriculture – Forest Service
82 Forestry Sciences Laboratory East Wing, 1972
U.S. Department of Agriculture – Forest Service
82 Forestry Sciences Laboratory West Wing, 1975
U.S. Department of Agriculture – Forest Service
82 Forest Science Wing Addition - Forest Research Laboratory Oregon State University, 1967
Payne & Settecase, Architects
82 Building Specifications for Oregon State University Forestry Building, 1968
Hamlin, Martin & Schultz, Architects
82 Solicitation Forms for Forestry Sciences Laboratory North Wing, 1970
Pacific Northwest Forest and Range Experiment Station
82 Irrigation System and Landscaping - Forestry Sciences Laboratory, 1976
U.S. Department of Agriculture - Forest Service
82 Solicitation Forms for Forestry Sciences Laboratory East Wing, 1974
U.S. Department of Agriculture - Forest Service
82 Solicitation Forms for Forestry Sciences Laboratory West Wing, 1975
(U.S. Department of Agriculture - Forest Service
82 Solicitation Forms for Forestry Sciences Laboratory Service Building,, 1970
Pacific Northwest Forest and Range Experiment Station
82 Solicitation Forms for Forestry Sciences Laboratory, 1976
U.S. Department of Agriculture - Forest Service
Pharmacy Building, 1960-1964
Box
82 Specifications, Alteration and Addition to Pharmacy Building, 1964
Herman Brookman, Architect
82 Alteration and Addition to Pharmacy Building, 1960-1962
Herman Brookman, Architect
Physical Plant, 1968-1986
Box
82 Physical Plant Shops Alterations Project Manual, 1986
Jeppsen, Miller & Tobias, Architects
82 A Resume of the Physical Plant Operation at Oregon State University, 1968
Plageman Hall, 1960
Box
82 General Contract: General, Mechanical, and Electrical Work for Additions and Alterations to Student Health Service Building, 1960
Chris Jeppsen, Architect
82 Electrical Contract: General, Mechanical, and Electrical Work for Additions and Alterations to Student Health Service Building, undated
Poling and Cauthorn Residence Halls, 1956
Box
83 Specifications for Men’s Dormitory Units A & B and Cafeteria, 1956
Burns, Bear, McNeil & Schneider, Architects
83 Specifications for Kitchen Equipment in Men’s Dormitory A & B and Cafeteria, 1956
Burns, Bear, McNeil & Schneider, Architects
83 Specifications for Interior Furnishing for Men’s Dormitory Units A & B and Cafeteria, , 1956
Burns, Bear, McNeil & Schneider, Architects
83 Electrical Specifications for Men’s Dormitory Units A & B and Cafeteria, 1956
cBurns, Bear, McNeil & Schneider, Architects
83 General Specifications for Men’s Dormitory Units A & B and Cafeteria, 1956
Burns, Bear, McNeil & Schneider, Architects
Radiation Center Building, 1962-1986
Box
83 Specifications for Nuclear Reactor Addition to the Radiation Center, 1965
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
83 Oregon State University TRIGA Reactor Annual Report, 1982
83 Oregon State University TRIGA Reactor Annual Report, 1984
83 Oregon State University TRIGA Reactor Annual Report, 1986
83 Design of Radiation Center Building, 1962
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
83 Modification of Agreement between General Dynamics Corporation and State Board of Higher Education, 1965
Oregon State Board of Higher Education
83 Contract with General Atomic for Purchase of TRIGA Mark II Nuclear Reactor, Oregon State University, 1965
Oregon State Board of Higher Education
83 TRIGA Mark II Reactor General Specifications and Description, 1964
Residence Hall Quadrangle, 1965-1972
Box
83 Feasibility Study of Lounge and Office Arrangements in Residence Hall Quadrangle, 1965
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
83 Program for Feasibility Study - Quad Residence Halls, 1972
Rogers Hall, 1959-1966
Box
83 General Specifications for Mechanical Engineering Building, 1966
Wilmsen, Endicott & Unthank, Architects
83 Analysis of Design for the Mechanical Engineering Building, 1959
Wilmsen, Endicott & Unthank, Architects
Snell Residence Hall, 1958-1984
Box
83 Specifications for Kitchen Equipment in Women’s Residence Hall and Dining Hall, 1958
Burns, Bear, McNeil & Schneider, Architects
83 Specifications for Built-in-Furniture for Women’s Residence Hall and Dining Hall, 1958
Burns, Bear, McNeil & Schneider, Architects
83 Oregon State University Foundation Furniture Specification and Bidding Instructions: Departmental Space Requirements Study, Need Assessment, and Design Development Report, 1984
Jeppsen, Miller & Tobias, Architects
83 Specifications for Women’s Residence Hall and Dining Hall, 1958
Burns, Bear, McNeil & Schneider, Architects
Spring Sports Complex, 1971-1973
Box
83 Contract Documents for the Construction for Oregon State University Spring Sports Complex, 1973
Cornell, Howland, Hayes & Merryfield
83 Oregon State University Spring Sports Complex, 1972
(Oregon State Board of HigherEducation
83 Program for Conceptual Study of Spring Sports Complex at Oregon State University, 1971
Office of Planning and Institutional Research
83 Squaw Creek Fish Culture Facilities - Building Specifications, 1971
Planning and Institutional Research
83 Feasibility Study for Agricultural Hall, Strand Hall, 1963
Bear, McNeil, Schneider, Bloodworth and Hawes Architects
83 Student Cooperative Housing, Master Site Study, 1964
Hamlin and Martin Architects
Veterinary Medical Teaching Hospital, 1977-1979
Box
83 Veterinary Medical Teaching Hospital, 1978
Payne, Settecase, Smith and Partners Architects
83 Proposed Veterinary Medical Teaching Hospital-Clinic, 1977
Office of Planning and Institutional Research
83 Electrical Construction Specifications for the Veterinary Medical Teaching Hospital, 1979
Payne, Settecase, Smith & Doss, Architects
83 Mechanical Construction Specifications for the Veterinary Medical Teaching Hospital, 1979
Payne, Settecase, Smith & Doss, Architects
83 General Construction Specifications for the Veterinary Medical Teaching Hospital, 1979
Payne, Settecase, Smith & Doss, Architects
Veterinary Medical Isolation Laboratory, 1968-1973
Box
84 Building Program for Veterinary Isolation Facility, 1968
Office of Planning and Institutional Research
84 Proposed Changes to Animal Disease Research Isolation Facility Contract, 1973
Neil Farnham, Architect
84 Addendum No. 1 - Animal Disease Research Isolation Facility, 1973
Neil Farnham, Architect
84 Specifications for Oregon State University Animal Disease Research Isolation Facility, 1973
Neil Farnham, Architect
84 Waldo Hall - Feasibility Study for Waldo Hall, 1963
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
Water Research Demonstration Laboratory - State of Oregon Board of Higher Education , 1965
Box
84 Contract Documents for the construction of a Water Research Demonstration Laboratory, 1965
Cornell, Howland, Hayes & Merryfield, Architects
Weatherford Hall, 1965-1972
Box
84 Remodeling Program for West Wing of Weatherford Hall, 1972
Office of Planning and Institutional Research
84 Rehabilitation Study of Weatherford Hall, 1965
Blair & Zaik, Architects
Weniger Hall, 1958-1980
Box
84 Mechanical Systems Testing and Adjusting Data for Weniger Hall North and Weniger Hall South, 1978
Burns, Bear, McNeil & Schneider, Architects
84 Mechanical System Investigation of Weniger Hall, 1980
Morrison, Funatake, Inouye, Andrews, Inc. Consulting Engineers
84 General Specifications for Addition to Physics Chemistry Building, 1960
Burns, Bear, McNeil & Schneider, Architects
84 Specifications for 1965 Alterations to Physics Chemistry Building for Meteorology and Bio-Physics, 1965
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
84 General Specifications for Physics Chemistry Building, 1958
Burns, Bear, McNeil & Schneider, Architects
West Hall, 1959-1960
Box
84 Specifications for Kitchen Equipment in Dormitory Unit #5 and Cafeteria, 1959
Burns, Bear, McNeil & Schneider, Architects
84 Specifications for the Interior Furnishings in Dormitory Unit #5 and Cafeteria, 1960
Burns, Bear, McNeil & Schneider, Architects
84 General Specifications for Dormitory Unit #5 and Cafeteria, 1959
Burns, Bear, McNeil & Schneider, Architects
84 Dormitory Unit “5" and Cafeteria for Oregon State College, 1959
Burns, Bear, McNeil & Schneider, Architects
84 Wiegand Hall - Mechanical Systems Testing and Adjusting Data for Wiegand Hall, 1977
Morrison, Funatake & Assoc., Engineers
Wilkinson Hall, 1970-1973
Box
84 Earth Sciences Addition, 1971
Jeppsen, Miller and Tobias, Architects
84 Mechanical Systems Testing and Adjusting Data for Earth Sciences Addition, 1973
Jeppsen, Miller and Tobias, Architects
84 Proposal for a Graduate Science Facilities Grant for the Earth Sciences Building, 1970
Office of Planning and Institutional Research
84 Withycombe Hall - Withycombe Hall Valve Chart, undated
Multiple Building Projects, Campus Plans, and non-OSU Structures, 1909-1992
Box
84 Adult Student Housing (ASH) Project, 1972
2 reports-HUD funded 170-unit housing project built on Witham Hill Drive in NW Corvallis, but not managed by OSU
84 Agricultural Science Complex, 1969
Hamlin, Martin & Schultz, Architects
84 Agricultural Science I - Building Program for Agricultural Science at Oregon State University, 1968
Office of Planning and Institutional Research
84 A Brief Historical Resume of OSU’s Long Range Physical Development Plans, circa 1985
84 Campus Landscape Maintenance Planning Report, 1980
Department of Architecture and Landscape Architecture
84 Campus Outdoor Lighting Plan for Oregon State University, 1971
Donald Hearing and Stanley Reed, Engineering & Design Associates
84 Campus Outdoor Lighting Plan for Oregon State University, 1979
Ray Loofburrow and Stanley Reed, Engineering & Design Associates
84 Capital Construction Priorities, 1968
Oregon State Board of Higher Education
84 Carpets in Residence Hall Corridors - Contract Document, 1969
Office of University Engineer
85 Community Center Conceptual Study Program, 1971
85 Condensate Return Lines Corrosion Study, 1984
85 Creating the Future: A Plan for Beginning the 90's, 1990
Electrical Distribution System and Facilities Reports, 1971-1979
Box
85 Long Range Study of Primary Electrical Distribution Facilities for Oregon State University, 1971
Stanley Reed and Michael Unger, Engineering & Design Associates
85 Proposed Additions Electrical Distribution System 1973-75 Biennium, 1987
85 Proposed Additions Electrical Distribution System 1973-75 Biennium, 1980
85 Review of Electrical Distribution System Capacity and Loads for Oregon State University, 1979
Stanley Reed and Michael Unger, Engineering & Design Associates
85 Fire Alarm Study, 1971
Morrison, Funatake & Associates, Inc., Consulting Engineers
Handicapped accessibility studies, 1975-1986
Box
85 Specifications for the Removal of Architectural Barriers to the Handicapped in Various Buildings at Oregon State University, 1981
Stastny & Graham, Architects
85 Handicapped Accessibility Phase II and Electrical and Computer Engineering Building Project No. 2: Related Alterations Handicapped Accessibility, 1986
Stastny Architects
85 Removal of Architectural Barriers work Location Reference, 1980
Office of Planning and Institutional Research
85 Removal of Architectural Barriers to the Handicapped in Various Buildings at Oregon State University: Report of Facility Survey and Recommendations for Facility Improvements to Improve Program Accessibility, 1975-1976
2 reports- Atelier/Northwest, Architects)
85 Kansas State University’s Six University Study, 1985
Office of Budgets
85 Oregon State University Academic Planning and University Policies, 1962
85 Oregon State University Administrative Cost/Structure Assessment-Final Report, 1992
85 Oregon State University/Heritage Annexation, 1982
Paul Green & Associates, Inc., Engineers & Land Surveyors
85 Oregon State University Long Range Development Plan, 1964
85 Oregon State University Physical Development Plan, 1987
85 Oregon State University Space Utilization Studies, 1972-1985
3 folders
OSSHE
85 Physical Facilities Inventory-Revisions to Section E, 1991
85 Physical Plant Repairs and Incidental Improvements for Four-Year Period 1939- 40 to 1942-43, 1939
Physical Plant Studies, 1986-1989
Box
85 Marking Stairs for Visually Impaired, 1989
85 Impact of Resource Allocation Policies on Universities Chemistry Research Laboratories, 1986
University of Michigan and Cornell University
85 Planning and Procedures Handbook for Campus and Building Development, 1970
86 Program for Feasibility Study of University Union Facilities, 1972
Office of Planning and Institutional Research
Re-roofing Investigations and Repair Proposals, 1983
Box
86 Re-roofing Investigation for Nash Hall, Navy R.O.T.C. Building, and Women’s Building, 1983
Martin, Soderstrom & Matteson, Architects
86 Re-roofing Investigation for Memorial Union Building and McAlexander Fieldhouse, 1983
Martin, Soderstrom & Matteson, Architects
86 Waterproofing Proposals for Women’s Building and Gill Coliseum, , 1983
86 3-M Roofing Specifications for Oceanography Building, 1983
86 3-M Roofing Specifications for Armory Roof, 1983
86 Report on Oregon Agricultural College, 1909
Olmsted Brothers- Landscape Architects
86 Sewer Utility Study Part A Program Development, 1979
86 Steel Waterline Replacement, 1982-1987
86 Subsurface Soils Data, 1967
Shannon & Wilson, Inc., Soil Mechanics and Foundation Engineers
86 Tour of Facilities-School of Agriculture (Phases I and II), 1980
Facilities Planning and Use Committee
86 Traffic Study - Corvallis Area Transportation Study, Transportation Plan 1985 Interim Report, 1969
Technical Advisory Committee, U.S. Department of Transportation Bureau of Public Roads, and Department of Housing and Urban Development
86 Transition Plan, 1978
Office of Planning and Institutional Research
86 Transportation, Circulation and Parking-OSU, 1983
Carl H. Buttke, Inc.-Consulting Transportation Engineer
86 Utilities Survey (2 reports), 1959
phrase
86 Utility Tunnel Extension , 1969
W. Bruce Morrison and Associates, Inc., Consulting Engineers
Corvallis Development Projects and Planning Reports and Studies, 1967-1988
Box
86 Community Center Plan, Corvallis Oregon, 1967
86 Sewer Investigation, Public Works Department, 1975
86 The Corvallis Bypass - Draft Environmental Impact Statement, United States Department of Transportation, 1978
86 Adopted Comprehensive Plan, City of Corvallis, 1978
86 Circle Boulevard - Walnut Boulevard - Draft Environmental Impact Statement, United States Department of Transportation, 1978
86 Circle Boulevard - Public Corridor - Design Hearing Transcript, City of Corvallis, 1979
86 Walnut Boulevard - Draft Environmental Impact Statement, United States Department of Transportation, 1979
86 Public Corridor Design Hearing Transcripts (Walnut Boulevard), City of Corvallis, 1979
86 Land Development Code - Draft for Planning Commission Review, City of Corvallis, 1980
86 The Potential for a Research - Technology Park in Corvallis: A Preliminary Analysis, Oregon District 4 Council of Governments, 1981
phrase
86 Contract Documents for the Construction and Improvement of: Madison Avenue Reconstruction - S.W. Sixth St. to S.W. Eleventh St., City of Corvallis, 1981
86 A Research Technology Park in the Corvallis Area an Examination of Feasibility and Options, Oregon District 4 Council of Governments, 1982
86 McKee High Technology Park - Application and Annexation Comprehensive Plan Amendment and Development District Change, Paul and Green Associates, Inc., 1982
86 Sunset Research Park - A Research Technology Park, City of Corvallis, 1983
86 North University Area Plan, City of Corvallis, 1983
87 Corvallis Transportation Plan, City of Corvallis, 1983
phrase
87 Capital Investment Plan, City of Corvallis: 1988-1993, 1988
2 reports- one is proposed
87 Downtown Streetscape Plan: Drafts, 1988
2 reports-City of Corvallis
Box
88 Plans of Formal Gardens, pre-1940
Building Specifications, 1924-1954
Box
89 Dairy Barn, 1929
89 Hand Ball Courts Building, 1929
89 Greenhouses, 1927
89 Horse Barn, 1924
89 Pharmacy, 1924
89 Physics Building, 1927
Covell Hall
89 Sheep Barn, 1929
89 Women’s Gymnasium Building, 1925
Women’s Building
88 Chemical Engineering [Gleeson Hall], 1954
88 Experiment Station - Pendleton Field Station, ca, 1929
88 Pavilion, 1948
Gill Coliseum
88 Home Economics Building, 1951
80 Home Management House, 1948
88 Navy ROTC Building, 1945
not built
88 Oceanography Building, undated
Burt Hall
Building Specifications and Bids, 1946-1963
Box
90 Animal Industries Building (Withycombe Hall), 1950
2 folders
90 Dormitories, 1961-1963
90 Engineering Wing, 1947
14 folders
90 Food Technology Building (Wiegand Hall), 1950
90 Home Management House, 1948
90 Industrial Building, 1946
90 Paving Specifications, 1948
90 Pavilion (Gill Coliseum), 1948
90 Poultry Brooder House, 1953
90 Women’s Dormitory (Sackett Hall), 1946-1947
Proposed Structures, 1930-1935
Box
91 Chemistry Building Costs, 1930-1935
91 Physical Plant Repairs and Incidental Improvements for Four-Year Period 1939/40 – 1942/43, 1939
The report includes information about all campus structures including original costs and restoration value as well as some plans and drawings.
91 Memorial Union Long Range Development Planning, 1970
91 OSU Physical Development Plan, 1976
91 OSU Roof Management Plan – Interim Report, 1988
91 Mitchell Playhouse Facilities Evaluation, 1989
91 Facility Condition Analysis for the Administrative Services Building, 1995
91 Orchard Street Structure (Richter House) Removal, 1992
91 Demolition of Building at 2827 Orchard and Restoration of Site, 1992
91 Facilities Services Annual Report for 1997-1998, 1998
91 Campus Development Plan (Draft) for 2000-2010, 2000
91 Campus Master Plan, 2003
91 The 1965-1971 Capital Construction Program of the Dept. of Higher Education (OSSHE) , 1966
91 Building Program Proposed by the State Board of Higher Education, 1961
* Comparative Residence and Dining Hall Information on Construction Methods, Materials, Functional Requirements, Appointments and Areas from questionnaires dated 1959, 1961
1 map folder

^ Return to Top

Series IV:  Capital Construction Project Files, 1962-1997
8.5 cubic feet including 6 photographs  ( 11 boxes)

Series IV documents building construction projects budgeted for $100,000 or more. The Capital Construction Project Files contain bid documentation, correspondence, memoranda, photographs, as well as meeting minutes from the Oregon State System of Higher Education (OSSHE) Building Committee. The bulk of the records in this series pertain to the construction of Burt, Nash, and Peavy Halls and the Bloss and Arnold residence halls. This series includes the 5000 files for several projects in the mid-1990s: dock construction at the Hatfield Marine Science Center; renovations at McNary and Milam Halls; construction of the Property Administration Building; reconstruction of the Industrial Building (Cascade Hall) after the 1992 fire; renovations at Withycombe Hall for the University Theater; and ADA upgrades at Langton Hall and the Women's Building. Additional materials pertaining to these and other capital construction projects are available in Series II, III, and VI.

Container(s)
Description
Box
87 Bloss-Arnold Combined, 1971
87 Central Heating Plant Boiler, 1971
87 Peavy Hall, 1971
87 Orchard Court Community Center, 1972
87 Wave Tank, 1972-1973
87 Kerr Library First Addition, 1970-1972
87 Horse Center, 1971-1972
87 Earth Science Building, 1971-1974
87 Hatfield Marine Science Center Housing, 1972-1975
87 East Area Residence Halls-Phase I and II, 1969
87 Milne Computer Center, 1968-1969
87 Milne Computer Center, 1968-1969
87 Oceanography Addition, 1965-1967
87 Nuclear Reactor Addition to Radiation Center, 1972-1975
87 Rogers Hall, 1965-1968
87 Cordley Hall First Addition, 1965-1967
87 Finley Hall, 1965-1967
Includes photographs.
87 Utility Tunnel Extension, 1964-1970
87 USDA Forestry Science Lab Services Wing, 1966-1970
87 Administrative Services Building, 1969-1971
87 Crop Science Building, 1980
87 Cultural and Conference Center-LaSells, 1979-1980
87 Gilbert Hall Addition, 1978-1980
87 Pharmacy Building Addition, 1964-1966
87 Hatfield Marine Science Center Oyster Hatchery Addition, 1965-1968
87 Kidder Hall Alterations, 1964-1965
87 Avery and Dixon Lodges, 1965-1966
87 Conversion of Research Vessel Yaquina, 1963-1964
87 Radiation Center, 1962-1964
87 Dormitories Number 7 and 8, 1963-1964
87 Kerr Library Building Construction, 1962-1964
87 McNary Dormitory and Cafeteria, 1962-1964
87 Biosciences Building, 1968-1970
87 Hatfield Marine Science Center-Meeting/Dining Building, 1975-1976
87 Electrical Distribution Facilities, 1970-1974
87 Memorial Way Pedestrian Mall, 1973-1974
87 Dearborn Hall Remodel, 1974-1975
87 Animal Disease Research Isolation Facility, 1973-1975
87 Recreation Center (Dixon), , 1973-1976
87 Animal Care Facility, 1974-1977
87 Spring Sports Complex, 1972-1973
87 Married Students Housing Addition, 1963
87 Conversions of Solariums to Student Rooms, 1963
87 Dairy Center, 1968
87 Newport Research Support Facility, 1980
87 Andrews Experimental Forest Facility Improvements, 1980
87 Golf Course Proposal, 1973-1979
87 Crop Science Building , 1976-1981
87 Aquaculture Research Facility, 1977-1979
87 Memorial Union Phase II Improvements, 1976-1978
87 Yaquina Bay Dorm Facilities, 1968
87 Forest Research Lab Wing Addition, 1968
87 Medical Science Building Cafeteria, 1968
87 Pharmacy Greenhouses, 1964-1965
87 Memorial Remodel Phase IV, 1981-1983
87 Washington Way Tennis Courts Renovation, 1981
87 Veteran Medicine Hospital, 1979-1980
87 Memorial Union Phase III, 1980
87 Parking Improvements, 1980-1981
87 Parker Stadium Turf Replacement, 1984
2 folders
92 Oceanography Building (Burt Hall), 1965-1974
13 folders
92 Bioscience Building (Nash Hall), 1966-1972
24 folders
89 Bioscience Building (Nash Hall, 1966-1972
93 Bioscience Building (Nash Hall), 1968-1972
2 folders
93 Forestry Building (Peavy Hall), 1966-1972
22 folders
93 Bloss Hall, 1969-1972
15 folders
89 Bloss Hall, 1969-1972
94 Arnold Hall, 1964-1972
21 folders
119-120 Hatfield Marine Science Center (HMSC) Dock Construction, 1995-1997
120-122 Industrial Building Reconstruction, 1993-1996
122 McNary Hall Renovations, 1995-1997
122 Milam Hall Renovation, 1997-1998
122-123 Property Administration Building, 1994-1995
123 Withycombe Laboratory Theater, 1991-1997
123-124 Langton Hall and Women's Building ADA Upgrade, 1993-1996

^ Return to Top

Series V:  Facilities Planning and Use Committee Records, 1981-1985
1.25 cubic feet  ( 2 boxes)

Series V documents the activities of the Facilities Planning and Use Committee and the coordination of campus and facilities planning, room use, and renovation and building construction projects. The records include correspondence, meeting minutes, memoranda, project proposals, and reports. See also Series IX, Committee Records.

Container(s)
Description
Box
95 1981-1984
20 folders
96 1985
6 folders

^ Return to Top

Series VI:  General Construction Files, 1989-1997
0.8 cubic foot  ( 2 boxes, including 1 oversize box)

Series VI documents the design and construction of Bates Hall and the Forest Ecosystem Research Laboratory and consists of budgets, correspondence, memoranda, notes, and reports.

Container(s)
Description
Box
96 Family Studies Center (Bates Hall), 1989-1990
2 folders
96 Forest Ecosystem Research Laboratory, 1996-1997
10 folders
113 Forest Ecosystem Research Laboratory Project Schedule, 1996
apx 20x24 in.
2 sheets

^ Return to Top

Series VII:  Minor Building Modification Files, 1985-1993
3.5 cubic feet including 108 photographs  ( 4 boxes and 1 map folder)

The Minor Building Modification Files document building repair and maintenance projects from the mid-1980s through early 1990s and are arranged alphabetically by building name. Several of the files include photographs.

Container(s)
Description
Box
97 Administration Building, 1991-1992
97 Apperson Hall, 1991-1992
97 Ballard Extension, 1991-1992
97 Benton Hall, 1991-1993
97 Bexell Hall, 1992
97 Burt Hall, 1991-1993
4 folders
97 Campus General, 1989-1993
2 folders
97 Cordley Hall, 1991-1993
2 folders
97 Crop Science Building, 1992-1993
97 Dearborn Hall, 1992-1993
97 Dryden Hall, 1990-1992
97 Education Hall, 1991-1992
97 Fairplay Office/Laboratory, 1992
97 Family Study Center, 1991-1993
97 Forest Research Lab, 1992
97 Gilbert Hall, 1991-1992
98 Gill Coliseum, 1991-1992
98 Gleeson Hall, 1991
includes 6 photographs
98 Graf Hall, 1991-1993
98 Green Houses, 1992-1993
98 Ground Water Research Lab, 1991
98 Hazardous Waste Facility, 1991
98 Heating Plant, 1990-1992
includes 4 photographs
98 Hinsdale Wave Tank, 1990
98 Hispanic Cultural Center, 1991
98 Hovland Hall, 1992
98 Hyslop Farm Buildings, 1992
98 Industrial Building, 1992
98 Kerr Library, 1991-1993
98 Kidder Hall, 1992-1993
98 Langton Hall, 1991-1993
98 LaSells Stewart Center, 1991-1993
98 Magruder Hall, 1985-1993
2 folders
98 McAlexander Fieldhouse, 1985
98 Memorial Union, 1985-1992
98 Merryfield Hall, 1985-1992
98 Milam Hall, 1985-1992
98 Milne Computer Center, 1985
98 Mitchell Playhouse, 1985
98 Moreland Hall, 1985-1992
98 Motor Pool, 1985
includes 1 photograph
98 Nash Hall, 1985-1992
2 folders
98 Naval Armory, 1985
98 Oak Creek Lab, 1985
98 Oceanography Administration Building, 1985
98 Oceanography Warehouse, 1991-1993
98 Off-Campus Housing, 1992
98 Orchard Street Nursery, 1985
includes 2 photographs
98 Parker Stadium, 1985-1993
2 folders
includes 3 photographs
98 Parking Lots, 1985-1993
includes 3 photographs
98 Peavy Arboretum, 1990-1991
99 Peavy Hall, 1985-1993
5 folders
includes 64 photographs
99 Pharmacy Hall, 1985-1993
2 folders
includes 9 photographs
99 Physical Plant, 1985
includes 3 photographs
99 Plageman Infirmary, 1985-1993
includes 5 photographs
99 Poultry House, 1992
99 Public Safety Building, 1985
99 Rabbit Buildings, 1985
99 Radiation Center, 1985
includes 9 photographs
99 Rogers Hall, 1985
99 Seed Lab, 1985-1992
includes 2 photographs
99 Shepard Hall, 1985-1992
99 Snell Hall, 1985-1993
includes 3 photographs
99 Social Science, 1985
includes 3 photographs
99 Strand Agriculture Hall, 1985-1992
2 folders
includes 1 photograph
Map Case
* College of Agricultural Sciences Proposed Office Arrangement, 1991
1 sheet
99 Surplus Property Building, 1991
includes 3 photographs
99 Vet Diag Lab, 1985
includes 3 photographs
99 Vet. Med. Animal Isolation Lab, 1985
99 Veterinary Research Lab, 1985
99 Vocational Shops, 1985
99 Waldo Hall, 1985-1992
100 Weniger Hall, 1985-1993
3 folders
100 Wiegand Hall, 1985-1993
100 Wilkinson Hall, 1985-1992
100 Withycombe Hall, 1985-1993
2 folders
includes 2 photographs
100 Women’s Building, 1985-1992

^ Return to Top

Series VIII:  General Subject Numbered Files, 1968-1991
4.6 cubic feet  ( 5 boxes)

The General Subject Numbered files document building maintenance and renovation projects and various aspects of the daily management of campus structures including energy consumption and conservation, sewage services, custodial services, water supply, and HVAC system maintenance. The records include contracts, correspondence, and reports. Some of the files are arranged by architect or contractor and others by building. The bulk of the records are for the 1980s.

Container(s)
Description
Box
100 G. Acker-Architect, 1985-1986
17020
100 Brown & Caldwell, 1981-1986
17020
100 Butke-Transportation, Parking Study Agreement, 1981-1987
17020
100 CH2M-Heating Plant Economizer, 1986
17020
100 James Carpenter, 1986
17020
Carson (Carson, Bekooy, Gulick, and Associates Consulting) Supplements, 1986-1988
Box
100 Campus Water System (#1), 1986-1987
17020
100 BalEx, Heating Plant, Misc. (#2), 1986-1988
17020
100 Cordley 3097 (#3), 1987
17020
100 Conmar (#4), 1987
17020
100 Rogers Hall Air Balancing (#5), 1987
17020
100 Waldo (#6), 1987
17020
100 Weniger Lighting (#7), 1987
17020
100 Ocean I Rm. 426 Cooling (#9), 1987-1988
17020
100 Burt Rm. 424A Cooling (#10), 1987
17020
100 Langton Hall Shower Exhaust (#11), , 1987
17020
100 Nash Hall Rm. 14 Humidity/Temp. Control (12/16), 1988
17020
100 Moreland Hall Fume Hood (#13), 1988
17020
100 Burt 178 Cooling (#15), 1988
17020
100 Cordley Mients Facility (#18), 1988
17020
100 Weniger 5th Floor Cooling (#21), 1988
17020
100 Misc (#24), 1988
17020
100 Food Service Warehouse Freezer (#27), 1989
17020
100 Fume Hood Investigation, 1987
17020
100 Snell Water Piping, 1987
17020
100 Water Piping Replacement, 1984-1985
17020
100 Weniger Vacuum Pump, 1987
17020
100 Energy Consultant Selection, 1983-1988
2 folders
17020
101 Soderstrom Architects Payments/Supplements, 1987-1988
17020
101 Soderstrom Architects Correspondence, 1987
17020
101 Stastny Architects Handicapped Access. Payments, 1985-1988
17020
CH2M-Supplements, 1986-1988
Box
101 LaSells Stewart Center HVAC (#4), 1986-1987
17020
101 HMSC Seawater Chiller (#5), 1987-1988
17020
101 Kidder HVAC Modifications (#8), 1987
17020
101 Langton Pool Roof (#11, #13), 1987-1988
17020
101 Poling Hall (#12), 1987
17020
101 Burt 383 AC Improvements (#14), 1988
17020
101 Food Toxicology Chiller (#15), 1988
17020
101 Underground Fuel Tanks, 1988
17020
101 Devco Engineering Payments, 1988-1989
17020
101 General Parking Lot-Consultants, 1988
17020
101 Geotechnical Resources, 1980-1984
17020
101 Interior Designers, General, 1987
17020
101 Jeppsen, Miller & Tobias-Covell Fire Escape, 1988-1989
17020
101 Jeppsen, Miller & Tobias-Electrical and Computer Engineering/Related Alt.Payments, 1989
2 folders
17020
101 Parking Garage Study, 1989
17020
101 TBG/Womens Building Biomech Lab, 1987-1988
17020
101 Contracts, Award Fee, 1987
17024
101 Sasaki Associates-Consultants, general, 1989
17027
101 Alterations to Apperson and Merryfield Hall, 1986
17027
101 Crew Facilities-Samard, 1986
17030
101 Crew Facilities-Mcallister, 1986-1987
17030
101 Memorial Union Building Dome Reroofing, 1986
17030
101 Building Manager Memo, 1984-1987
17030
101 Crop Science, 1985
17030
101 Gilmore Hall Reroof, 1985-1987
17030
101 Architectural services-Gill Coliseum, Project 1, 1984-1986
17030
102 Heating Plant Cogeneration Equipment Purchase CH2M-Hill Northwest, 1989
17030
102 Irrig. Systems Installation-Phase III, 1986-1987
17030
102 McNary & Wilson Halls Roof Replacement, 1986-1987
17030
102 Memorial Union Dome Reroof, 1986-1987
17030
102 Computer Science Building Alterations, 1984-1985
17030
102 Wiegand Hall Fume Hood Installation, 1987
17030
102 Administration Steam Line Cross-Over, 1984
17035
102 Ballard Extension Hall - Room 118, 1985-1986
17035
102 Benton Hall Sewer, 1984-1985
17035
102 Black Cultural Center, 1987
17035
102 Campus Waterline Replacement, 1985-1987
17035
102 Cordley Remodel Room 1060, 1984-1985
17035
102 Education Hall Recoat Exterior Wall, 1984
17035
102 EE Tech Ballasts Social Science, 1980-1981
17035
102 Farm Crops Remodel, 1983
17035
102 Farrier School, 1985
17035
102 Furnaces-Campus Maint. Agreement, 1985
17020
102 Gill Coliseum Lighting, 1979-1980
17035
102 Heating Plant Cogeneration-Bid Opening, 1989
17035
102 Heating Plant Emergency Generator Auto Start-up, 1983-1984
17035
102 Heating Plant Tank Liner, 1983
17035
102 Housing Emergency Sanitary Sewer Hook-up at Housing Warehouse, 1983
17035
102 Langton Kalwall, 1985
17035
102 Lasells Stewart Center Air Conditioning, 1984-1985
17035
102 Library Timers For Stacks, 1981-1982
17035
102 McAlexander Fieldhouse Recaulk, 1978-1979
17035
102 Memorial Union Mech. Room Asbestos Removal, 1985
17035
102 Memorial Union Rotunda Painting, 1985
17035
102 Milam Hall Automatic Door, 1983
17035
102 Ocean Administration Remodel, 1984-1985
17035
102 Oxford House Storm Drain, 1986
17035
102 Parker Stadium - Paint Press Box, 1985
17035
102 Reroof Apiary Building 176, 1985-1986
17035
102 Roof Entomology Research Farm, 1986
17035
102 Roofing-Poultry C, Printing, Storage, 1983
17035
102 Sewerline Proj.-Phase VII Root Control, 1987
17035
102 Sidewalk Project, 1986-1987
17035, 2 folders
102 30th & Oak Creek Drainage Ditch, 1986
17035
102 30th Street Mall Sculpture, 1982-1983
17035
102 Vet Dairy Barn Walk-in Cooler, 1985
17035
102 Waldo Hall Room 242, 1985
17035
102 Weniger Hall–Reglaze Greenhouse, 1984
17035
102 West Greenhouse Growth Chambers, 1983
17035
102 Wilkinson Raised Floor, 1984
17035
103 Wilkinson Transformer Retro-File, 1986
17035
103 Womens Building Pipe Insulation, 1986
17035
103 Womens Building Window Replacement, 1986
17035
103 Women’s Softball Field Fence, 1983-1984
17035
103 Ag. Utilities & Seed Lab Asbestos Removal, 1989
17037
103 Bookstore Remodel, 1989
17037
103 Kerr Library Computer Center, 1988
17037
103 Langton/Women’s Building O & M, 1985
17037
103 Langton/Womens Building Refinish Floors, 1986
17037
103 Refinish Floors for Langton and Women’s Building, 1986
17037
103 Misc. Sewer Projects, 1986
17037
103 Nash Hall - Backdraft Dampers for Fume Hoods, 1981-1983
17037
103 Parker Stadium Lights Computerized Operation, 1984
17037
103 Poultry Re-roofing, 1978
17037
103 Senior Class Project - Walk in Kerr - Kidder Quad, 1985
17037
103 Plan Reviews, Approval, 1985
17039
103 Minority Businesses, 1987-1988
17060
103 Marriott Contract Info, 1988-1989
18040
103 Contract Info - ABM, 1986
18040
103 Contract Bidding Info, 1988-89
18040
103 Service Contract Servicemaster, 1986
18040
103 SMI Contract Information, 1987-1988
18040
103 Contract Change Orders - Marriott, 1990
18041
103 Contract Change Orders ABM, 1983-1987
18041
103 Contract Change Orders Servicemaster, 1987
18041
103 Custodial Services Corres. Marriott, 1989-1990
2 folders
18042
103 Payment Back-up Info - Marriott, 1989-1990
18043
103 Custodial Services - Corres. Marriott, 1988-1989
18042
103 Custodial Services Correspondence - ABM, 1986
18042
103 Custodial Services Correspondence - Servicemaster, 1986-1987
2 folders
18042
103 Custodial Services - Correspondence, 1983-1985
3 folders
18042
103 ABM, 1985-1986
18043
103 Payment Back-up Information ABM, 1983-1984
18043
103 Payment Back-up Info Servicemaster, 1986
18043
103 Department of Energy, 1981-1986
19010
103 Energy Articles, 1986
19020
103 Energy General Information, 1988
19025
103 Energy - Misc./General, 1983-1987
19025
103 Heating Degree-Day Histories, 1972-1986
19025
103 Nacubo Awards Program, 1986
19040
103 Energy Audits, 1979-1985
19050
103 Energy Control Progress Reports, 1979
19050
103 Governor’s Task Force on Energy Management, 1977-1984
19050
103 State Energy Mgmt. Annual Report, 1985-1987
19050
103 Technical Ast. Reports Ocean I, II, 1981-1983
19050
104 BPA - General, 1983-1985
20010
104 BPA/PP&L Lighting Contract, 1983
20010
104 BPA Solicitation, 1981-1983
20010
104 Energy Conservation, General, 1983; 1988
2 folders
20020
104 Energy Conservation Measures, 1975-1987
20020
104 Cycle 4, 1983-1986
20030
104 Public Energy Pkg - Application Burt VAV, 1989
20035
104 PP&L/Brown & Caldwell, 1986
20035
104 Bookplan Updates, 1987
21045
104 Electricity Consumption, 1971-1990
29030
104 Misc. Electricity Correspondence, 1988
29030
104 Electricity Consumption, 1988
29030
104 Misc. Gas Correspondence, 1970-1988
2 folders
29040
104 Energy Conservation Projects, 1988
20040
104 Gas Consumption, 1968-1983
29040
104 Malheur Experiment Station, 1990-1991
9035
104 Tennis Court Renovations, 1988-1991
29040
104 Monthly Cost for Steam, 1977-1988
2 folders
29090
104 Water Meter Exemption Readings, 1988
29110
104 Monthly Reports, 1982-1984
31040
104 Dorms and Cafeterias - Hartman Payments, 1981-1983
31040
104 Contract-Honeywell for orig. EMS, 1981-1984
31040
104 Wide Carriage Printer, 1978
19050
104 EMS Correspondence, 1986
31065
104 Fixed Equipment Review, 1987
32017
104 Mobile Equipment, 1986
32050
104 Pumps/Air Compressors, 1984
32080
104 Refrigeration, 1985
32090
104 Backflow Preventors, 1985-1986
33010
104 Irrigation, 1986
33010
104 Monthly Maintenance Letters, 1989
33015
104 Summer, 1981
33017
104 Public Improvement Projects, 1988
33035
104 Preventative Maintenance General Information, 1985-1990
33040
104 Backflow Preventor Listing, 1985-1988
35020
104 Backflow Prevention Testing, 1984-1987
35020
104 Backflow Preventors, 1974-1980
35020

^ Return to Top

Series IX:  Committee Records, 1966-2003
0.6 cubic foot  ( 2 boxes)

Series IX consists predominantly of materials pertaining to the University Safety Committee, the Oregon State Board of Higher Education Building Committee, and the Campus Planning Committee as well as committee records pertaining to the campus master plan and re-engineering. The records include meeting minutes, reports, correspondence, and related documentation. See also Series V, Facilities Planning and Use Committee Records.

Container(s)
Description
Box
91 Facilities Planning Committee – Proposal for Humanities and Social Science and Fine Art Complex, 1966
91 University Safety Committee, 1970-1989
3 folders
91 Building Committee (Oregon State Board of Higher Education), 1955-1968
9 folders
131 Campus Planning Committee, 2001-2003
131 Master Plan, 2002
131 Re-Engineeering, 2001-2003

^ Return to Top

Series X:  Correspondence, 1888-2003
2 cubic feet  ( 5 boxes)

The correspondence documents various policies, procedures, and activities of Facilities Services. The series consists primarily of the Gordon Skelton correspondence for 1908-1938 and correspondence from the 1960s pertaining to campus planning, policies, and procedures.

Container(s)
Description
Box
91 Water Tower, 1888-1889
91 Capital Repairs and Rehabilitation, 1951
91 Annual Summaries of Occupational Injuries and Illnesses for 1997 thru 1999, 1998-2000
91 OSU Building Addresses, 2003
91 Separate Bids Chicago Plan (Reference from University of Illinois), 1964
91 Procedure Directions for Contract Matters, 1965-1969
91 Procedure Directions for Contract Matters Where Grant Funds Involved, 1968
91 Manual of Instructions Grant Applications Title II, 1967-1968
91 Labor Unions, 1961-1962
91 Cost Comparisons: Physical Plant and Contractor’s Costs, 1965
91 Associated General Contractors Meeting, 1966
91 Equal Employment Opportunity Compliance Reports, 1963-1965
91 U.S. Office of Education Grant Funds Contract Procedures, 1965-1969
91 Legislative Actions in 1971 Affecting Public Contracting, 1971
91 Facility Projection Reports, 1970
91 Dormitory Construction Costs Comparative Analysis from 1957 thru 1966, 1966
91 Capital Outlay, 1962-1969
3 folders
Gordon V. Skelton, 1908-1938
The Skelton correspondence consists of materials documenting Skelton's oversight of campus buildings, especially fire protection; roads; and walkways in his role as the campus Superintendent of Surveys, Maps, Roads and Walks, and Fire Protection. Of special note is correspondence with architect John Bennes. The correspondence also includes materials pertaining to his role as chair of the Civil Engineering Department.
Box
105 Fire Protection, 1908-1935
13 folders
105 Accident Commission, 1919-1927
105 Board of Education and General Administration, 1933-1935
105 Business Office, 1920-1933
2 folders
105 Chamber of Commerce, 1915-1916
105 College Buildings and Property (and letters to Mr. Bennes relating to same),, 1911-1927
105 Dean Covell’s Office, 1909-1927
105 Dean’s Office, 1933-1934
105 Dietzgen and Co., 1916-1926
105 General Highway and Civil Engineering, 1908-1919
105 Graduate Committee, 1933-1935
105 Highway Department, 1926-1933
105 Highway Research Board, 1921-1934
105 Highway Research, 1934-1935
105 Library, 1928-1934
105 Memorial Union, 1931-1934
105 Peavy – Dolan Controversy, 1913-1917
105 Portland (Ore.) Bridge Reports by J.P. Newell, 1923
105 Registrar’s Office, 1929-1935
105 Roads,, 1916-1925
105 Surveys and Lands, 1909-1915
105 University of Oregon, 1933-1935
105 Walks and Improvements Constructed, 1910-1912
105 Miscellaneous, 1909-1921
2 folders
94 General, 1908-1938
3 folders
88 Project Details Forms – Capital Construction, 1961-1969
2 folders
88 Priority List Capital Construction Proposed, 1961-1966
2 folders
88 Building Program Directives, 1967-1969
88 Senate Bills 142 and 143, 1965
88 Senate Bill 428, 1967
88 Long Range Planning, 1940-1970
3 folders
88 Early Planning of Buildings, 1940-1964
2 folders
88 Value of Land and Buildings, 1959-1967
88 Construction Survey Forms Questionnaire, 1959-1961
88 Air Conditioning Policy, 1962-1967
88 Major Rehabilitation Program, 1960
88 Removal of Obsolete or Temporary Space, 1960
88 Building Codes, 1938-1941
131 Facilities Services 2002-2003 Budget, 2002
131 Move of Transportation Services and Parking to Adams Hall, 2003

^ Return to Top

Series XI:  Land Ownership and Property, 1940-1951
0.1 cubic foot  ( 1 box)
Container(s)
Description
Box
88 Land Records, 1940-1951
Copies of land records (from County Assessor?) for Oregon State College property acquired between 1940 and 1951 and a compilation of information about earlier land acquisitions.

^ Return to Top

Series XII:  Policies and Procedures, 1986-1994
0.01 cubic foot  ( 1 box)

The Policies and Procedures include a small number of documents pertaining to environmental health and safey and disaster planning.

Container(s)
Description
Box
88 Environmental Health and Safety Hazard Communication Program – Supervisor Outline, 1986
88 Safety Training, 1994
88 CFC Phase-Out, circa 1994
88 Disaster Management Plan, 1990
88 Fire Marshall Policy on Electrical Appliances, 1992

^ Return to Top

Series XIII:  Publications, 1989-2001
0.1 cubic foot  ( 1 box)

The Publications consist of newsletters, guides, and handbooks. The newsletters include both internal newsletters for Facilities Services staff and external newsletters for the OSU campus community. The newsletters include staff and department news items as well as information about new building construction and remodeling projects.

Container(s)
Description
Box
88 Newsletter, 1989-2001
3 folders
Facilities Bulletin; Facilities Services Bulletin; Facilities Link; and Our News
88 Physical Plant Service Guide for 1989/90, 1989
88 Working Safely with Hazardous Substances – A Handbook for Employees, circa 1989-1992

^ Return to Top

Series XIV:  Space Use, 1960-1969
0.6 cubic foot  ( 2 boxes, including 1 oversize box)

Series XIV consists of materials pertaining to space use on the Oregon State University campus in the 1960s and includes data on square footage of usable space and use as well as reports and correspondence.

Container(s)
Description
Box
88 Space Utilization Report, 1966
88 Comparison of Classroom and Laboratory Occupancy – Fall Terms 1965 and 1966, 1967
88 Institutional Analysis (Space), 1967
88 Utilization of Classrooms and Laboratories for Fall Term 1967, 1968
88 Analysis of Non-Residential Space by Principal Use, 1968
88 Space Standards, 1968
88 Square Feet of Buildings and Assigned Areas, 1968-1969
109 Use-Function Tabulation Sheets, 1960-1964
apx 23x31 in.
Unbound set of about 115 ledger sheets documenting the use and function of campus building space broken down by room. In addition to recording room function (e.g. office, classroom, laboratory, or conference room) and use (e.g. graduate/undergraduate instruction, public service, or staff accommodation), the ledger entries give net usable space, room capacity, and department jurisdiction. An alphabetical index in included as well as a three-page summary of department space use for 1964.

^ Return to Top

Series XV:  Staff Meeting Minutes, 1992-2001
0.8 cubic foot  ( 1 box)

The Staff Meeting Minutes include reports of weekly department heads meetings and less-frequent all staff meetings. They provide detailed information and updates on major consruction projects as well as minor modifications that are underway and on the general administration and functioning of Facilities Services.

Container(s)

^ Return to Top

Series XVI:  Time Records, 1913-1939
0.3 cubic foot  ( 1 box)

The time books are for laborers who worked on walkways, roads, sewers, ditches, and other projects on campus. Much of the work was supervised by Gordon V. Skelton, Professor of Highway Engineering and Superintendent of Surveys, Maps, Roads and Walks, and Fire Protection.

Container(s)
Description
Time Books, 1913-1939
Box
88 1913-1919
88 1923-1929
88 1933-1939
Box
88 Time Certificates, 1936-1937

^ Return to Top

Series XVII:  Renderings (Drawings) of Campus Buildings, 1949-1975
2 cubic feet  ( 1 oversize box and 7 map folders)

These architectural renderings depict the settings of proposed campus buildings; they were typically prepared during the design process for a structure. Some of the renderings are in color.

Container(s)
Description
Box
* 976-76-19a: Agriculture Science I, undated
Cordley Hall, 1954
Box
110 P199:03: Agricultural and Biological Science Building, undated
110 P199:04: Agricultural and Biological Science Building, undated
* 987-76-11a: First Addition and Second Addition to Cordley Hall, undated
* 987-76-04: Agricultural and Biological Science Building, 1954
Great Hall, 1975
Box
*
* 1975
110 Kerr Administration Building, Administration Building, 1968
* 987-76-05: Magruder Hall, undated
* 987-76-10: Marine Science Center (Hatfield), Lab and Library Additions, undated
110 P199:09: Milam Hall, Addition to Home Economics Building, 1950
* 987-76-16: Milne Computer Center, undated
* 987-76-07: Nash Hall, undated
110 987-76-07: Oregon State Stadium (Reser Stadium), 1952
Sackett Hall, undated
Box
110
110
* 987-76-18: Student Housing - Arnold Hall Cafeteria, undated
Student Housing - Bloss Hall, undated
Box
*
* 987-43-13: Preliminary Study of Residence Hall Unit "1" of Complex "A", South Residence Hall Group
* P199:11: Student Housing - West Hall, Dormitory Unit 5 and Cafeteria, 1959
110 P199:02: Weatherford Hall, Men's Dormitory and Cafeteria Building, 1955
Weniger Hall, 1955-1957
Box
110 P199:07: Physics Chemistry Building, 1955
110 P199:08: Physics Chemistry Building, undated
* 987-76-17: Physics Chemistry Building, 1957
110 P199:01: Wiegand Hall, Food Technology Building, 1949
Wilkinson Hall, undated
Box
110 Earth Sciences Addition
* 987-76-02: Earth Sciences Addition (color)
* 987-76-06: Earth Sciences Addition (line drawing)
110 P199:10: Withycombe Hall, Animal Industries, undated

^ Return to Top

Series XVIII:  Book Plans, 1960-1993
1.5 cubic feet  ( 3 oversize boxes)

Book plans are floor plans for campus buildings and structures that provide information on general layout, square footage, and room use for classrooms, research and teaching laboratories, offices, and storage areas.

Container(s)
Description
Box
109 1960-1993
450 plans in 6 folders
114-115 circa 1970-1989
550 plans in 2 volumes

^ Return to Top

Series XIX:  Lighting (Interior) Study, circa early-mid 1980s
1 cubic foot, including 230 sheets  ( 2 oversize boxes)

Floor plans of most campus buildings annotated with the locations of fluorescent and incandescent fixtures, the number of watts or tubes, and which fixtures have been partially or completely disconnected.

Container(s)
Description
Box
113 All buildings (except Merryfield Annex and Hall and Weniger and Withycombe Halls)
2 folders
109 Merryfield Annex and Hall; Weniger and Withycombe Halls

^ Return to Top

Series XX:  Campus, Farm, and Property Maps, 1899-1990
2 cubic feet  ( 1 oversize box, 1 roll storage box, and 5 map folders)

The Campus, Farm and Property Maps include maps of existing structures, plans for campus development, campus boundaries, property ownership, and maps of Corvallis, Oregon. The maps are listed in chronological order.

Container(s)
Description
* Map of the College Farm and Campus, 1899
Scale 1"=132'; incomplete draft.
* Map of the College Farm and Campus, circa 1908
Scale 1"=132'; colored.
* General Plan Grounds and Buildings Oregon Agricultural College, 1910
3 sheets
Scale 1"=100'. After a report by Olmsted Brothers; Arthur L. Peck; photocopies.
* General Plan Grounds and Buildings Oregon Agricultural College, 1910
2 sheets
Scale 1"=100'. Known as Olmsted Plan; includes detailed explanatory note from G.V. Skelton.
Campus and Farm Maps, 1914-1921
10 sheets
Prepared by Gordon V. Skelton at scale of 1"=50'; show topography, building locations, streets and walks, property lines and ownership, sewer and other utility lines, drain tiles, and trees and shrubbery.
Campus Maps
Box
* 1-A: Lower Campus, 1914 and March 1920
* 2-A: Library Quadrangle, July 1914 and March 1921
* 2 1/2-A: Buildings on Monroe Avenue including the Mechanic Arts Building (now Merryfield Hall) and the Engineering Laboratory (now Graf Hall), Dec. 1920
* 3-A: South of Jefferson including the Armory (now McAlexander Fieldhouse), Bell Field, and Waldo Hall, July 1914 and March 1920
* 4-A: Memorial Union Quadrangle west to Dairy Barns (Agricultural Utilities Building), July 1914 and March 1921
* 5-A: North of Campus Way, July 1914 and March 1921
Farm Maps, July 1914
Box
* 6-B: Poultry Buildings and Poling Hall
* 7-B: Includes Women's Dormitory (now Ballard Extension Hall) and Cauthorn (now Fairbanks) Hall and west to barns
* 8: North of railroad tracks
* 9: Includes Hog Barn and Artillery Barn
* Road and Walk Improvements at OAC Barns, 1918
Scale 1"=50'.
* Campus and Farm, 1921
Scale 1"=200'.
* Campus Plan, 1928
Scale 1"=100'. Showing the A.D. Taylor Plan, dated March 1926, of future development superimposed upon present plan of campus.
Box
116 Armory Heat Plant, 1931
Scale 1"=20'. Prepared by G.V. Skelton; shows tunnels and existing utilities from railroad to playhouse; 15.5 x 80 inches.
* South Farm, 1933
Scale 1"=100'.
* Campus Plan, circa 1940
* Madison Street Entrance, 1941
Scale 1"=10'.
* General Study of Campus and Adjacent Area by A.D. Taylor, 1944
Scale 1"=200'. Proposed schedule for construction of buildings.
* Oregon State College Map of Corvallis and Surrounding Territory by A.D. Taylor, 1945
Scale 1"=500'.
* Land Acquisition Map Showing Recommended Order of Purchase, 1947
4 sheets
Scale 1"=400'; includes land valuations.
* Preliminary Study of Collegiate Athletics Area, 1947
Scale 1"=100'.
109 Campus Boundary and Property Owned, 1949-1961
9 sheets
Scale 1"=300'. Includes maps for 1949, 1950, 1953, 1955, 1957 (2 sheets), and 1961 (2 sheets).
* Corvallis, Oregon, 1950
Scale 1"=400'; includes one duplicate.
109 Study for the Development of Lower Campus at Oregon State College, 1952
Scale 1"=50'. Includes proposed future living units for OSC students and faculty between Monroe and Jefferson and 9th and 11th Streets.
* Property Map - Benton Linn, and Polk Counties, 1953
Scale 1"=40 chains.
* Relocation of Philomath Road, 1959
3 sheets
Shows property ownership along south margin of campus.
* Campus Boundary and Property Owned, 1963-1968
3 sheets
Scale 1"=300'. Includes maps for 1963, 1966, and 1968.
109 Long Range Development Plan, 1964
Scale 1"=400'; photographic print.
109 South Residence Hall Group, 1964
2 sheets
Scale 1"=120'; photographic prints.
109 Campus Property Owned - West Campus Area, 1968
Scale 1"=300'; from 35th to 43rd Streets and Harrison Blvd. to Washington Way.
* Long Range Development Plan, 1964
Scale 1"=200'.
* Property Map - Benton, Linn, and Polk Counties, 1969
Scale 1"=40 chains.
* Campus Map, circa 1975
Original drawing, ink on mylar.
* Physical Development Plan, 1976
Scale 0.75"=200'; includes two duplicates.
109 City of Corvallis Future Land Use Map, 1978
Scale 0.75"=1600'.
* Existing Campus Plan, 1989
Scale 1"=200'.
* Campus Map, circa 1990
Scale 1"=200'.
* West Campus, undated
2 sheets
Scale 1"=100'; from 35th Street to west and Washington Way to Jackson Street; shows elevation contours, roads, and structures.

^ Return to Top

Series XXI:  Aerial Photographs, 1952-1979
2 cubic feet, including 8 photographs  ( 2 roll storage containers, 5 map folders, and one wall-mounted item)

Series XXI consist of aerial photographs of the OSU campus and vicinity and Corvallis, Oregon. They are listed below in chronological order.

Container(s)
Description
* 987-76-31: Oblique aerial view of Oregon State College campus, August 6, 1952
21x32 inches
Photograph by Western Ways.
* 987-76-32: Lower campus and Corvallis residential area, circa 1955
45x45 inches
From about 9th to 17th Streets and Jefferson south to A street. Photograph by Western Ways.
* 987-76-29: OSU campus and Corvallis, May 13, 1963
3 prints; 34x36 inches and 25x29 inches (2 prints)
Scale 1 in. = 200 feet. Covers 11th-35th Streets (E-to-W) and Western to Tyler Avenues (S-to-N). Photograph by Western Ways. Three prints mounted on wood laminate.
* 987-76-30: OSU campus, 1968
20x33 inches
Tinted oblique aerial photograph of OSU campus; mounted on wood laminate. Photograph by Photo-Art Commercial Studios.
Box
117 987-76-34: OSU campus and vicinity, 1972
41 inches wide; unknown length
Photograph by H.G. Chickering.
* P199:13; 987-76-34: Corvallis and OSU campus, 1975
43x96 inches
View extends from Willamette River on east to 53rd Street on west and from approximately Buchanan Avenue on the north to Hwy. 20 on the south.
118 987-76-35: OSU campus and vicinity, 1979
55 inches wide; unknown length
Scale 1 in = 200 feet; color print.
* 987-76-33: Farm area, undated
45x52 inches
Photograph by Western Ways.

^ Return to Top

Series XXII:  Photographs, 1963
0.2 cubic feet, including 3 photographs  ( 1 map folder)

Series XXII consists of photographs of 3-dimensional architectural models of the Yaquina Bay Marine Sciences Laboratories and the Marine Science Center.

Container(s)

^ Return to Top

Subjects

    • Corporate Names :
    • H.J. Andrews Experimental Forest (Or.)
    • Hatfield Marine Science Center.
    • Oregon Agricultural College--Buildings.
    • Oregon State Agricultural College--Buildings.
    • Oregon State College--Buildings.
    • Oregon State University--Buildings.
    • Subject Terms :
    • Architects--Oregon.
    • Campus planning--Oregon--Corvallis.
    • College buildings--Oregon.
    • College facilities--Oregon--Planning.
    • Engineering--Study and teaching (Higher)--Oregon--Corvallis.
    • Oceanographic research ships--Oregon.
    • Public art--Oregon--Corvallis.
    • Student housing--Oregon--Corvallis.
    • Geographical Names :
    • Adair Village (Or.)
    • Camp Adair (Or.)
    • Form or Genre Terms :
    • Aerial photographs.
    • Architectural drawings (visual works)
    • Floor plans.
    • Maps.
    • Photographic prints.
    • Renderings (drawings)
      • Other Creators :
      • Bennes, John V.
      • Olmsted Brothers.
      • Oregon Agricultural College. Physical Plant.
      • Oregon State College. Physical Plant.
      • Oregon State University. Physical Plant.

      ^ Return to Top